Control Center Remodel & Door Controls RFP
Aug 21, 2026
Closes
Oct 1, 2026
In general, the work consists of: upgrades to the control center via new pass through for med bags and radios, new HVAC install, make open ceiling concept to conceal electrical. This project also includes installation of new LED lights, new countertops, new radio holder, flooring, and counsel desk. Installation of door/intercom lights control system to be digital and mounted on control counsel. This work is located within a secure setting. See attached files and outside link.
