26-10000-02-GM (Rockton Twp Re-Surf Cassidy Dr) RFP
Posted
Sep 10, 2026
Sep 17, 2026
Mill Existing HMA Pavement 1.5" deep and 6' wide along the edge of pavement as shown in plans (9 locations) to remove pavement distresses and pave these areas with HMA surface Mix. Remove pavement surface 3' wide along the (6) PCC Private Entrances to create butt joints. -Grind Butt joints at mainline and side Roads as shown on plans. - After fixing the Base repair, whole Cassidy Dr will be resurface using 1.5" thick HMA surface Mix.
