Eagle Lake Lift Stations 1, 3, and 4
Aug 18, 2026
Closes
Sep 8, 2026
The work includes but not limited to 3 EA remove existing control panel; 3 EA install lift station control panel; 3 EA site grading 150 SF concrete pavement; 4 EA bollards 450 SY turf establishment.
