Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
White Mountain National Forest
This RFQ issued by the U.S. Forest Service requests quotations for HVAC replacement and repair at the White Mountain National Forest’s Androscoggin and Saco Ranger Stations. The project includes replacing multiple AC units, air handlers, and performing boiler maintenance and plumbing work. The procurement is a Small Business set-aside under NAICS 238220 and requires compliance with all applicable electrical, plumbing, and environmental regulations.
Posted Date
Jan 27, 2026
Due Date
Feb 27, 2026
Release: Jan 27, 2026
White Mountain National Forest
Close: Feb 27, 2026
This RFQ issued by the U.S. Forest Service requests quotations for HVAC replacement and repair at the White Mountain National Forest’s Androscoggin and Saco Ranger Stations. The project includes replacing multiple AC units, air handlers, and performing boiler maintenance and plumbing work. The procurement is a Small Business set-aside under NAICS 238220 and requires compliance with all applicable electrical, plumbing, and environmental regulations.
White Mountain National Forest
The USDA Forest Service issued Solicitation 12445526Q0005 for replacement/upgrades of electrical panels and a transformer at the White Mountain National Forest (Saco Ranger District in Conway, NH and WMNF Headquarters in Campton, NH). The work includes upgrading a 400A breaker/current transformer cabinet, a 400A electrical panel, a 24-circuit load center, replacing a damaged transformer, bringing grounding and wiring to NFPA NEC 2023 standards, and disposal of removed equipment; performance is required within 90 days after NTP with work estimated to begin around 2025-10-01. This is a Total Small Business set-aside (NAICS 238210) with attachments including a Statement of Work, Schedule of Items, and Wage Determination.
Posted Date
Jan 20, 2026
Due Date
Feb 20, 2026
Release: Jan 20, 2026
White Mountain National Forest
Close: Feb 20, 2026
The USDA Forest Service issued Solicitation 12445526Q0005 for replacement/upgrades of electrical panels and a transformer at the White Mountain National Forest (Saco Ranger District in Conway, NH and WMNF Headquarters in Campton, NH). The work includes upgrading a 400A breaker/current transformer cabinet, a 400A electrical panel, a 24-circuit load center, replacing a damaged transformer, bringing grounding and wiring to NFPA NEC 2023 standards, and disposal of removed equipment; performance is required within 90 days after NTP with work estimated to begin around 2025-10-01. This is a Total Small Business set-aside (NAICS 238210) with attachments including a Statement of Work, Schedule of Items, and Wage Determination.
White Mountain National Forest
Perform laboratory tests from water samples collected by FS personnel for the following contaminant categories as applicable to the water system: Microbiological, as specified in Env-Dw 702; Radiological, as specified in Env-Dw 703; Inorganics, as specified in Env-Dw 704; Organics, as specified in Env-Dw 705; Secondaries, as specified in Env-Dw 706; Lead and copper, as specified in Env-Dw 714; Disinfection residuals, byproducts, and byproduct precursors, as specified in Env-Dw 715; Filtration, disinfection, waste recycling, as specified in Env-Dw 716; Groundwater monitoring, as specified in Env-Dw 717, Env-Wq 402.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
White Mountain National Forest
Close: Jan 29, 2026
Perform laboratory tests from water samples collected by FS personnel for the following contaminant categories as applicable to the water system: Microbiological, as specified in Env-Dw 702; Radiological, as specified in Env-Dw 703; Inorganics, as specified in Env-Dw 704; Organics, as specified in Env-Dw 705; Secondaries, as specified in Env-Dw 706; Lead and copper, as specified in Env-Dw 714; Disinfection residuals, byproducts, and byproduct precursors, as specified in Env-Dw 715; Filtration, disinfection, waste recycling, as specified in Env-Dw 716; Groundwater monitoring, as specified in Env-Dw 717, Env-Wq 402.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
White Mountain National Forest
IGF::OT::IGF PROVIDE ALL LABOR, MATERIALS, SUPPLIES, TOOLS, EQUIP TO PROVIDE AND DELIVER 1 YORK RAKE, HT- 10 - SERIES, W/ 2' RAKE EXTENSION W/ STANDARD POLE TYPE HITCH EQUIVALENT TO PINTLE TYPE HITCH TO BARTLETT GARAGE, 31 PINE STREET, BARTLETT, NH 03812 PER QUOTE 2220
Effective Date
Jun 29, 2017
Expires
White Mountain National Forest
Expires:
IGF::OT::IGF PROVIDE ALL LABOR, MATERIALS, SUPPLIES, TOOLS, EQUIP TO PROVIDE AND DELIVER 1 YORK RAKE, HT- 10 - SERIES, W/ 2' RAKE EXTENSION W/ STANDARD POLE TYPE HITCH EQUIVALENT TO PINTLE TYPE HITCH TO BARTLETT GARAGE, 31 PINE STREET, BARTLETT, NH 03812 PER QUOTE 2220
White Mountain National Forest
IGF::OT::IGF FURNISH ALL LABOR, EQUIPMENT, SUPERVISION, AND SUPPLIES TO REMOVE AND REPLACE EXCAVATOR TRACK CHAINS AND WELD AND REPAIR IDLER CHANNEL ON BOTH SIDES
Effective Date
Apr 27, 2017
Expires
White Mountain National Forest
Expires:
IGF::OT::IGF FURNISH ALL LABOR, EQUIPMENT, SUPERVISION, AND SUPPLIES TO REMOVE AND REPLACE EXCAVATOR TRACK CHAINS AND WELD AND REPAIR IDLER CHANNEL ON BOTH SIDES
White Mountain National Forest
IGF::OT::IGF FURNISH ALL LABOR, EQUIPMENT, SUPERVISION, TRANSPORTATION AND SUPPLIES TO REMOVE AND REPLACE 2 YORK CONDENSER FAN MOTORS AND BLADES THAT WERE BROKEN AT FHQ. CONTRACTOR WILL ALSO PUT THEM BACK INTO SERVICE AND CHECK OPERATION.
Effective Date
Aug 18, 2016
Expires
White Mountain National Forest
Expires:
IGF::OT::IGF FURNISH ALL LABOR, EQUIPMENT, SUPERVISION, TRANSPORTATION AND SUPPLIES TO REMOVE AND REPLACE 2 YORK CONDENSER FAN MOTORS AND BLADES THAT WERE BROKEN AT FHQ. CONTRACTOR WILL ALSO PUT THEM BACK INTO SERVICE AND CHECK OPERATION.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Track White Mountain National Forest's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database