Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Wheelerville Union Free School District
Repairs in the following areas of the existing building: 1. Replace (2) exterior metal doors, frame and hardware. 2. Replace (1) interior door, frame and hardware. 3. Repair (1) interior gypsum board partition in break room. 4. Repair cracks in garage bay floor slab, prepare existing floor slab for new bus lift, and apply new floor coating. Plumbing: extend existing trench drain in service bay, keeping existing in operation. Fire alarm: alter existing system and add new construction, keeping existing in operation. Electrical related improvements for new bus lift controls. The owner is contracting with an equipment vendor under separate contract for the removal of the existing bus lift, foundation modifications for a new bus lift, installation of new surface mounted rotary bus lift which will commence on a date to be determined following completion of the floor slab modifications and electrical infrastructure.
Posted Date
Jun 9, 2026
Due Date
Jul 7, 2026
Release: Jun 9, 2026
Wheelerville Union Free School District
Close: Jul 7, 2026
Repairs in the following areas of the existing building: 1. Replace (2) exterior metal doors, frame and hardware. 2. Replace (1) interior door, frame and hardware. 3. Repair (1) interior gypsum board partition in break room. 4. Repair cracks in garage bay floor slab, prepare existing floor slab for new bus lift, and apply new floor coating. Plumbing: extend existing trench drain in service bay, keeping existing in operation. Fire alarm: alter existing system and add new construction, keeping existing in operation. Electrical related improvements for new bus lift controls. The owner is contracting with an equipment vendor under separate contract for the removal of the existing bus lift, foundation modifications for a new bus lift, installation of new surface mounted rotary bus lift which will commence on a date to be determined following completion of the floor slab modifications and electrical infrastructure.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge