CoWU Westside Roadway Reconstruction Phase 1 RFP
Posted
-
Nov 17, 2026
The project includes the reconstruction of approx. 1,930 LF of roadway pavement. The project will include reconstruction of driveways and walkways as needed. 1 LS traffic control, including flagmen, signs including detour signs, barrels, barricades, temporary striping and raised markers, arrow boards, maintaining all weather access to traffic, temporary transitions from proposed pavement to existing pavement, relocating existing traffic signs, complete in place; 16 EA furnish and install curb inlet and grate inlet protection barrier (ipb-i, ipb-ii, or combination ipb-1 + ipb-ii) complete in place.