Lincoln Avenue Resurfacing RFP
Posted
Sep 10, 2026
Oct 7, 2026
Work include hma milling, 3" or less; hma milling, 3" to 6"; hma 12. 5m64 surface course, 2 1/4" thick; hma 9.5m64 intermediate course, variable thickness; hma 19m64 case course, 4" thick; 15" high density polyethylene pipe; underdrain type f; inlet, type a; traffic stripes; tree removal.
