Gravel Road Excavation and HMA Paving
Posted
-
Sep 16, 2026
Work includes Excavation of 7.44 miles of gravel roadway up to a subgrade level of 12.5 inches to place an aggregate base and three layers of hot mix asphalt (HMA) paving. Project includes traffic control, temporary pavement markings, temporary traffic signs, conditioning of existing adequate bases, and utility structure adjustments across multiple specified road locations.
