Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Walsh County
Project consist of approx 4,823 CAl of fog seal; 46,200 GAl of emulsidi=fied asphalt; 1,203 TON of cover coat material; 13,880 LF of short term 4" line type NR; 83,306 LF of 4" pvmt MK painted line.
Posted Date
May 27, 2026
Due Date
Jun 11, 2026
Release: May 27, 2026
Walsh County
Close: Jun 11, 2026
Project consist of approx 4,823 CAl of fog seal; 46,200 GAl of emulsidi=fied asphalt; 1,203 TON of cover coat material; 13,880 LF of short term 4" line type NR; 83,306 LF of 4" pvmt MK painted line.
AvailableWalsh County
Contract Bond, 1.0 L SUM; Clearing & Grubbing, 1.0 L SUM; Removal of Structure, 1.0 L SUM; Remove Existing Fence, 235 LF; Common Excavation-Type B, 51 CY; Topsoil, 420 CY; Borrow-Excavation, 1,498 CY; Class 1 Excavation, 1.0 L SUM; Class 2 Excavation, 1.0 L SUM; Channel Excavation, 1.0 L SUM; Foundation Preparation, 1 EA; Water, 75 M GAL; Seeding Class II, 0.86 ACRE; Temporary Cover Crop, 0.33 ACRE; Hydraulic Mulch, 1.19 ACRE; Riprap Grade II, 616 CY; Silt Fence, 50 LF; Remove Silt Fence, 50 LF; Fiber Rolls 12IN, 2,125 LF; Remove Fiber Rolls 12IN, 1,050 LF; Floatation Silt Curtain, 150 LF; Remove Floatation Silt Curtain, 150 LF; Aggregate Surface Course CL 13, 465 TON; Bridge Substructure Concrete, 148.6 CY; Bridge Deck Concrete, 107.3 CY; Penetrating Water Repellent Treatment, 393.3 SY; Reinforcing Steel-Grade 60, 9,950 LBS; Reinforcing Steel-Grade 60-Epoxy Coated, 18,321 LBS; Structural Steel M270-Grade 36, 824 LBS; Structural Steel, 1.0 L SUM; Erect Structural Steel, 1.0 L SUM; Steel Piling HP 10 X 42, 1,100 LF; Steel Piling HP 12 X 53, 760 LF; Railing, 225 LF; Mobilization, 1.0 L SUM; Traffic Control Signs, 194 UNIT; Type III Barricade, 8 EA; Geosynthetic Material Type RR, 924 SY; Fence Barbed Wire 4 Strand, 235 LF; Flat Sheet For Signs-Type XI Refl Sheeting, 10 SF; Steel Galv Post-Telescoping Perforated Tube, 26.6 LF; W-Beam Guardrail, 50 LF; W-Beam Guardrail End Terminal, 4 EA; Abutment Underdrain System, 2 EA.
Posted Date
May 27, 2026
Due Date
Jun 18, 2026
Release: May 27, 2026
Walsh County
Close: Jun 18, 2026
Contract Bond, 1.0 L SUM; Clearing & Grubbing, 1.0 L SUM; Removal of Structure, 1.0 L SUM; Remove Existing Fence, 235 LF; Common Excavation-Type B, 51 CY; Topsoil, 420 CY; Borrow-Excavation, 1,498 CY; Class 1 Excavation, 1.0 L SUM; Class 2 Excavation, 1.0 L SUM; Channel Excavation, 1.0 L SUM; Foundation Preparation, 1 EA; Water, 75 M GAL; Seeding Class II, 0.86 ACRE; Temporary Cover Crop, 0.33 ACRE; Hydraulic Mulch, 1.19 ACRE; Riprap Grade II, 616 CY; Silt Fence, 50 LF; Remove Silt Fence, 50 LF; Fiber Rolls 12IN, 2,125 LF; Remove Fiber Rolls 12IN, 1,050 LF; Floatation Silt Curtain, 150 LF; Remove Floatation Silt Curtain, 150 LF; Aggregate Surface Course CL 13, 465 TON; Bridge Substructure Concrete, 148.6 CY; Bridge Deck Concrete, 107.3 CY; Penetrating Water Repellent Treatment, 393.3 SY; Reinforcing Steel-Grade 60, 9,950 LBS; Reinforcing Steel-Grade 60-Epoxy Coated, 18,321 LBS; Structural Steel M270-Grade 36, 824 LBS; Structural Steel, 1.0 L SUM; Erect Structural Steel, 1.0 L SUM; Steel Piling HP 10 X 42, 1,100 LF; Steel Piling HP 12 X 53, 760 LF; Railing, 225 LF; Mobilization, 1.0 L SUM; Traffic Control Signs, 194 UNIT; Type III Barricade, 8 EA; Geosynthetic Material Type RR, 924 SY; Fence Barbed Wire 4 Strand, 235 LF; Flat Sheet For Signs-Type XI Refl Sheeting, 10 SF; Steel Galv Post-Telescoping Perforated Tube, 26.6 LF; W-Beam Guardrail, 50 LF; W-Beam Guardrail End Terminal, 4 EA; Abutment Underdrain System, 2 EA.
AvailableWalsh County
Works include approx. 454 CY common excavation - type B; 1,112 TN foundation fill; 50 LF of silt fence; 10 EA type III barricade; 1,690 LF of 4" PVMT MK painted.
Posted Date
Apr 29, 2026
Due Date
May 14, 2026
Release: Apr 29, 2026
Walsh County
Close: May 14, 2026
Works include approx. 454 CY common excavation - type B; 1,112 TN foundation fill; 50 LF of silt fence; 10 EA type III barricade; 1,690 LF of 4" PVMT MK painted.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Sole Source: Not viable—pivot to cooperative purchasing.
Coops: Use a cooperative contract (e.g., Sourcewell) to make a pre-competed purchase.
Walsh County, ND: There is no evidence that sole source contracting is used.
Board meetings and strategic plans from Walsh County
The Board of Commissioners discussed several operational and administrative matters. Key topics included a proposal for a permanent county burn ban ordinance and updates on the transition to a new radio system for the Sheriff's Office. Project updates were provided for the jail construction, including bid packaging and design development. The Board approved a letter supporting the retention of a local judgeship and set the 2027 cost of living adjustment at 2.5%. Financial actions included the consolidation of various county bank accounts and the approval of a charitable gaming license renewal. Highway department discussions focused on damaged radar equipment, overweight farm equipment on bridges, and the approval of multiple utility and drainage permits. Additionally, the Board addressed extension office upgrades, a Fair Board infrastructure request, and acknowledged a professional sports signing within the county.
The meeting included a lifesaving award presentation, approval of an opioid litigation settlement, and authorization to support the retention of a judicial position. Significant time was dedicated to the jail project, including updates from engineers and input from Grand Forks County officials on staffing and planning. Other key actions included approving a construction engineering contract for a bridge replacement, renaming the bridge, and authorizing the installation of HVAC controls at the Chase building. The board also repealed and replaced the floodplain management ordinance, approved a conditional use permit for a flower farm, and authorized changes to IT service billing. Financial reviews included the first quarter reports, the transfer of inactive fund balances, an audit update, and a discussion on maturing bond reinvestment strategies. Finally, various administrative committee reports were provided regarding department meetings, staffing, and tax processes.
The board meeting included the introduction of new staff members, specifically a Victim Witness Coordinator and a Chief Correctional Officer. Detailed updates on the Walsh County Jail Project were provided, covering bid package schedules and ADA requirements. Financial discussions focused on jail project funding, balancing reserve levels, and capital levies. The Highway Department presented a countywide paving history analysis, cost estimates for road improvements, and an annual report, while also securing approval to advertise for an administrative assistant position and a drainage permit. Additionally, the board approved the first reading of an updated floodplain management ordinance for FEMA compliance and authorized the publication of a public information letter regarding the jail project.
The board discussed several items, including the performance of the Career Builders program and the upcoming job fair. A contract for the 2026 Hazard Mitigation Plan update was approved with Paramount Planning. The highway department presented its annual report, and the board approved the replacement of an overhead door operator at Shop 7 and a FEMA-funded bridge replacement project. A temporary contract was approved for tax-related and GIS assistance during a staffing transition. Additionally, the board addressed website accessibility requirements, authorized a remote position in the Auditor/Treasurer office, designated polling locations for the primary election, and approved the sale of tax-forfeited parcels. Discussions also covered jail financing options, zoning board issues, and potential inter-county coordination for jail project insights.
The agenda includes discussions on a new proposed opioid litigation settlement and consultation regarding a judicial judgeship vacancy. Project updates are scheduled for the jail and various construction engineering contracts, including a FEMA bridge project and automated technologies for the Chase Building. Other topics include bridge naming requests, signage grants, construction zones, floodplain management ordinances, and a veterans service office update. Additionally, the commission will review a conditional use permit, receive jail project feedback, discuss an NRG bill, approve election inspectors, review quarterly financial reports and audit updates, and address old national bonds.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Walsh County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge