2026-2027-Street-Repair-Contract RFP
Posted
-
Oct 29, 2026
The work will include the following items: Work consists of milling existing asphalt pavement (4,080 sy), full depth patching of existing pavement (20 tons), asphalt concrete surface course (380 tons), and crack sealing 4,400lbs.
