Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Westchester
12" & 8" PVC water main installation, construction of lateral WMQ storm sewers, abandoning the existing water main, water service box removal and replacement, valve vaults, fire hydrants, lead service replacement into the home, storm and sanitary sewer spot repairs, various roadway resurfacing treatments.
Posted Date
Mar 20, 2026
Due Date
Apr 7, 2026
Release: Mar 20, 2026
Village of Westchester
Close: Apr 7, 2026
12" & 8" PVC water main installation, construction of lateral WMQ storm sewers, abandoning the existing water main, water service box removal and replacement, valve vaults, fire hydrants, lead service replacement into the home, storm and sanitary sewer spot repairs, various roadway resurfacing treatments.
AvailableVillage of Westchester
Storm and sanitary sewer point repairs and all necessary restoration.
Posted Date
Mar 20, 2026
Due Date
Apr 7, 2026
Release: Mar 20, 2026
Village of Westchester
Close: Apr 7, 2026
Storm and sanitary sewer point repairs and all necessary restoration.
AvailableVillage of Westchester
Resurfacing via grind & overlay, combination concrete curb and gutter removal and replacement, driveway removal and\r replacement, PCC sidewalk removal and replacement, and all necessary restoration.
Posted Date
Mar 20, 2026
Due Date
Apr 7, 2026
Release: Mar 20, 2026
Village of Westchester
Close: Apr 7, 2026
Resurfacing via grind & overlay, combination concrete curb and gutter removal and replacement, driveway removal and\r replacement, PCC sidewalk removal and replacement, and all necessary restoration.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $10,000, use sole source; otherwise expect a formal competitive bid.
Coops: Only if needed, check whether your product is available via the Illinois State Joint Bid. If not, pivot back to the reseller route or prepare for a formal RFP.
Village of Westchester has no formal sole source process; bid waivers have occurred but are unpredictable. Treat sole source as deprioritized.
Track vendor wins and renewal opportunities
Village of Westchester
This contract is an Order Form between Flock Group Inc. and IL - Westchester PD for Flock Safety products and services, including the Flock Safety Platform, FlockOS Essentials, Flock Safety Falcon® LPR products, and professional implementation services. The initial term is 12 months, with automatic 24-month renewals. The total cost for the first year is $27,300.00, with an annual recurring subtotal of $26,500.00. Payment terms are Net 30, billed annually at first camera validation. The agreement includes various FlockOS features and detailed product descriptions. Terms and conditions are referenced via a URL.
Effective Date
Aug 26, 2025
Expires
Effective: Aug 26, 2025
Village of Westchester
Expires:
This contract is an Order Form between Flock Group Inc. and IL - Westchester PD for Flock Safety products and services, including the Flock Safety Platform, FlockOS Essentials, Flock Safety Falcon® LPR products, and professional implementation services. The initial term is 12 months, with automatic 24-month renewals. The total cost for the first year is $27,300.00, with an annual recurring subtotal of $26,500.00. Payment terms are Net 30, billed annually at first camera validation. The agreement includes various FlockOS features and detailed product descriptions. Terms and conditions are referenced via a URL.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Village of Westchester
The board conducted a special meeting during which an executive session was convened for the purposes of discussing the appointment, employment, compensation, and performance of village employees.
The Commission discussed the upcoming fall seminar hosted by the Illinois Fire and Police Commissioners Association. Key business included an update on the Fire Captain promotional examination process, including the schedule for the assessment and written exam. Additionally, the final register for the Police Sergeant promotional exam was presented and approved after the application of military veteran points. The meeting also included an executive session regarding personnel matters.
The commission discussed the promotion of an officer to the position of Police Sergeant, effective in December. Updates regarding the Board of Fire and Police Commission's rules and regulations were noted. Hiring status for entry-level firefighters was reviewed, and the initial Fire Lieutenant Promotional List was approved. An executive session was held to discuss personnel matters, including appointment, employment, compensation, promotion, and discipline.
The commission held a discussion with a representative from I/O Solutions regarding the application process for new firefighter candidates, including application fees, testing schedules, and orientation deadlines. Additionally, the commission reviewed the timeline for the Fire Captain promotional examination, finalized testing locations and dates, rescheduled an upcoming meeting due to the Labor Day holiday, addressed the ongoing process of organizing candidate documentation files, and initiated a search for legal counsel to assist with the Board's Rules and Regulations.
New business addressed the need to update Candidate Documentation, Candidate Files, and Candidate Correspondence with a structured check-off sheet and document tracking system to standardize candidate interviewing and hiring procedures. The Commission authorized a contract with I/O Solutions of Westchester for Candidate Polygraph Examination and Psychological Evaluation services. A review of the Rules and Regulations of the Westchester Fire and Police Commission was initiated, with legal counsel requested to ensure compliance with new fire department hiring legislation. A motion was passed to reschedule the September 2, 2013 meeting to September 3, 2013 due to the Labor Day holiday. Old business involved discussions regarding the Fire Department Captain Promotion Examination, which will include a review of the promotional process and test dates by I/O Solutions, with the assessment phase conducted by Illinois Fire Chiefs. The Fire Department Entry Level Examination dates and procedures are scheduled for discussion on July 29, 2013. Furthermore, the Commission was instructed by the Village Board to proceed with organizing a Police Sergeants Examination, which will be added to the July 29, 2013 agenda. The meeting included an executive session.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Westchester's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database