Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Union Grove
Removing old structures, clearing, grubbing, drain tile exploration & installation, culvert removal & replacement, pulverizing, reshaping & relaying pavement, excavation, grading, aggregate base, asphaltic surface, concrete sidewalk, pavement markings, signage, and all incidental items.
Posted Date
Jul 21, 2026
Due Date
Aug 4, 2026
Release: Jul 21, 2026
Village of Union Grove
Close: Aug 4, 2026
Removing old structures, clearing, grubbing, drain tile exploration & installation, culvert removal & replacement, pulverizing, reshaping & relaying pavement, excavation, grading, aggregate base, asphaltic surface, concrete sidewalk, pavement markings, signage, and all incidental items.
AvailableVillage of Union Grove
Project consist of approx 779 LF of 12" water main (open cut); 840 LF of granular backfill; 90 SY of concrete pavement; 12 LF of concrete curb an gutter; 130 SY of asphalt trench patch.
Posted Date
Apr 20, 2026
Due Date
Apr 30, 2026
Release: Apr 20, 2026
Village of Union Grove
Close: Apr 30, 2026
Project consist of approx 779 LF of 12" water main (open cut); 840 LF of granular backfill; 90 SY of concrete pavement; 12 LF of concrete curb an gutter; 130 SY of asphalt trench patch.
Village of Union Grove
The structure is a 150,000 gallon double ellipse elevated water storage tank with an estimated low-water level of 100 ft. The work includes: Exterior: Abrasive blast clean to an SSPC-SP6 commercial standard within containment. Apply a four (4) coat zinc epoxy urethane fluoropolymer system. Wet Interior: Abrasive blast clean to an SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Apply a polyurethane caulk to the roof lap seams. Pit Piping: Abrasive blast clean to an SSPC-SP6 commercial standard. Apply a two (2) coat epoxy system. Foundation: Repair grout and repair spalls. Abrasive blast clean and apply a two (2) coat epoxy system.
Posted Date
Apr 8, 2026
Due Date
Apr 29, 2026
Release: Apr 8, 2026
Village of Union Grove
Close: Apr 29, 2026
The structure is a 150,000 gallon double ellipse elevated water storage tank with an estimated low-water level of 100 ft. The work includes: Exterior: Abrasive blast clean to an SSPC-SP6 commercial standard within containment. Apply a four (4) coat zinc epoxy urethane fluoropolymer system. Wet Interior: Abrasive blast clean to an SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Apply a polyurethane caulk to the roof lap seams. Pit Piping: Abrasive blast clean to an SSPC-SP6 commercial standard. Apply a two (2) coat epoxy system. Foundation: Repair grout and repair spalls. Abrasive blast clean and apply a two (2) coat epoxy system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Do not pursue sole source; redirect to a cooperative path.
Coops: Frequently procures through Sourcewell and other eligible State of Wisconsin contracts; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Village of Union Grove: No clear sole source authority evident in public records; deprioritize this path.
Practical notes:
Board meetings and strategic plans from Village of Union Grove
The joint meeting focused on a closed session discussion regarding litigation involving Lynn E. Schuldt and Christina L. Bass v. Village of Union Grove and Village of Union Grove Board of Zoning Appeals. Following the closed session, both boards reconvened and approved a settlement agreement for the pending case, authorizing counsel to finalize the agreement for review and execution.
The board and commission meeting covered administrative and operational business, including the approval of financial bills. Key discussions included a closed session regarding the sale of public land and the subsequent authorization of an appraisal for village-owned property. Operational topics included logistics for the upcoming Super Saturday event, updates on water utility infrastructure projects, and the status of ongoing public works such as tree removal and equipment maintenance. The board also reviewed the compliance status of properties under a raze and repair order, allowing the owner to present an improvement timeline. Finally, various committee and commission reports were presented, covering updates on budget processes, future meeting schedules, and police department initiatives.
The board held public hearings regarding comprehensive plan amendments, zoning map changes for various parcels, and the approval of a planned unit development. Key actions included the retention of a Municipal Court Prosecutor, authorization of various zoning ordinances, approval of a certified survey map, and adoption of plans for a multi-family development. Additionally, committee reports were provided on administrative, finance, community development, library, and police matters, along with a discussion regarding infrastructure and flooding concerns.
The board reviewed and approved the monthly financial reports and vouchers. New business included the approval of library closing dates for upcoming holidays and staff in-service days, as well as a report regarding the approved budget. The director's report provided updates on staff training, the receipt of grants for educational programming and professional development, and the implementation of new services, such as a state park pass program and the installation of a Narcan supply station. Additionally, the board discussed the potential impact of proposed state legislation regarding parental notification policies for library checkouts.
The board reviewed and approved the monthly financial reports, balance sheets, and vouchers. Key discussion topics included the implementation of a new library initiative for state park passes. The library director provided a report covering attendance at a professional conference, facility maintenance projects, community outreach activities, and a successful scarecrow design contest. Additionally, the board reviewed updates to the circulation procedures regarding the retrieval of long-overdue library materials.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Union Grove's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge