Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Mantua
This project involves the replacement of the water distribution system in the Village of Mantua, including the installation of new 6-inch and 8-inch water main pipes and fire hydrants. The contractor will be responsible for all labor, materials, and equipment needed for the installation, interconnections, and surface restoration. The project is funded by the Water Supply Revolving Loan Account Program and has an estimated construction cost of $4,051,700.
Posted Date
May 8, 2026
Due Date
May 27, 2026
Release: May 8, 2026
Village of Mantua
Close: May 27, 2026
This project involves the replacement of the water distribution system in the Village of Mantua, including the installation of new 6-inch and 8-inch water main pipes and fire hydrants. The contractor will be responsible for all labor, materials, and equipment needed for the installation, interconnections, and surface restoration. The project is funded by the Water Supply Revolving Loan Account Program and has an estimated construction cost of $4,051,700.
AvailableVillage of Mantua
Purchase of the following vehicle and equipment: Ford 2025 F600 4x4 regular cab XLT 145" wheelbase with dual rear wheels 7.3L V8 gas engine 10-speed automatic TorqShift transmission snow plow preparation to include: ALPB93 Knapheide aluminum 9-foot flatbed with bulkhead Bulkhead dimensions: 40" high x 96" wide body dimensions: 111" long x 91.88" wide hoist system: KHR-1516SF-ED scissor hoist and subframe with rear hinge double-acting electric over hydraulic power unit additional equipment: Class 5 drop-back hitch with 2.5" receiver trailer wiring to rear with 7-pole RV plug wired to factory brake controller backup camera.
Posted Date
Feb 12, 2026
Due Date
Mar 2, 2026
Release: Feb 12, 2026
Village of Mantua
Close: Mar 2, 2026
Purchase of the following vehicle and equipment: Ford 2025 F600 4x4 regular cab XLT 145" wheelbase with dual rear wheels 7.3L V8 gas engine 10-speed automatic TorqShift transmission snow plow preparation to include: ALPB93 Knapheide aluminum 9-foot flatbed with bulkhead Bulkhead dimensions: 40" high x 96" wide body dimensions: 111" long x 91.88" wide hoist system: KHR-1516SF-ED scissor hoist and subframe with rear hinge double-acting electric over hydraulic power unit additional equipment: Class 5 drop-back hitch with 2.5" receiver trailer wiring to rear with 7-pole RV plug wired to factory brake controller backup camera.
Village of Mantua
Provide design-build services for its Mantua failing bridge removal & streambank stabilization project.
Posted Date
Feb 12, 2026
Due Date
Mar 13, 2026
Release: Feb 12, 2026
Village of Mantua
Close: Mar 13, 2026
Provide design-build services for its Mantua failing bridge removal & streambank stabilization project.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Village of Mantua
This document outlines the strategic direction for the Portage County Solid Waste Management District, aiming to reduce waste sent to landfills, ensure adequate waste management capacity, and promote recycling services for a safe and healthy environment. Key priorities include ensuring robust recycling infrastructure for residents and businesses, achieving a minimum 25% reduction and recycling rate for residential/commercial solid waste, maintaining operational staff and infrastructure, providing extensive education and awareness regarding available resources, continuously seeking new methods to divert waste from landfills, and completing a comprehensive debris management plan.
The Council of the Village of Mantua convened to discuss and amend sections of Title Nine of the Codified Ordinances. The amendments facilitate a transition to monthly water and sewer billing. Key changes include billing all customers of the water and sewer service system on a monthly basis starting June 1, 2014, and adjusting meter reading practices until radio read meters are installed. The ordinance also addresses water usage rates, service charges, and sewer service charges, including adjustments to residential and commercial rates effective at various dates. Additionally, the ordinance covers tampering with water meters, final billing procedures, and delinquency charges.
The ordinance approves and adopts a permanent budget for 2026 for the Village of Mantua, following a public hearing. It details the fund balances, revenues, and expenditures for various funds including the General Fund, Street Construction Maintenance & Repair, Road and Bridge Levy, State Highway, Cemetery, Police Training, Permissive Motor Vehicle License Tax, Village Hall Note Retirement, Buchert Park Walking Trail, Capital Projects, Police Capital Improvement, and Park Improvement. The budget includes provisions for property taxes, state shared taxes, intergovernmental revenues, charges for services, and earnings on investments.
The resolution establishes a separate fund, Sewer Capital Improvement Fund 5762, for tracking revenues and expenditures related to the sewer capital improvement fee charged to the Village's sewer customers. This fund is established in accordance with Ohio Revised Code Section 5705.09(F).
The resolution discusses the election of the standard allowance available under the revenue loss provision of the Coronavirus Local Fiscal Recovery Fund established under the American Rescue Plan Act. It permits the use of these funds for the provision of government services, such as road building and maintenance, health services, general government administration, environmental remediation, public safety services, maintenance of building infrastructure, and modernization of cybersecurity.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Mantua's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge