Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Mackinaw City
Approx., 5400 LF of water main installation and replacements, including the following: 2400 LF of new 12" transmission water main, 600' of 12" water main replacement, 2000 LF of 12" transmission water main, 300 LF of 12" water main and valve, 500 LF of 12" water main. All associated joints and gate valves, fire hydrants, and related restoration work will be completed simultaneously. Replacement of lead impacted water service lines, including exterior excavations, wall penetrations, and installation of meter yoke and city supplied meter, connection to existing plumbing, plus related appurtenances and restoration work will be included. On n. Huron, 84 LF of 10" sanitary sewer and 199' of 12” sanitary sewer are also included adjacent to water main work.
Posted Date
Jun 3, 2026
Due Date
Jun 30, 2026
Release: Jun 3, 2026
Village of Mackinaw City
Close: Jun 30, 2026
Approx., 5400 LF of water main installation and replacements, including the following: 2400 LF of new 12" transmission water main, 600' of 12" water main replacement, 2000 LF of 12" transmission water main, 300 LF of 12" water main and valve, 500 LF of 12" water main. All associated joints and gate valves, fire hydrants, and related restoration work will be completed simultaneously. Replacement of lead impacted water service lines, including exterior excavations, wall penetrations, and installation of meter yoke and city supplied meter, connection to existing plumbing, plus related appurtenances and restoration work will be included. On n. Huron, 84 LF of 10" sanitary sewer and 199' of 12” sanitary sewer are also included adjacent to water main work.
Village of Mackinaw City
Installation of approx., 10,955 LF of 16" diameter HDPE force main and required appurtenances, abandonment of the existing force main with approx., 360 CY of flowable fill, pavement, curb and gutter and sidewalk restoration, installation of 327 LF of cast in place sanitary sewer lining, 28 LF of sanitary sewer spot lining, 14 LF of sanitary sewer spot repairs and other Work.
Posted Date
May 22, 2026
Due Date
Jun 23, 2026
Release: May 22, 2026
Village of Mackinaw City
Close: Jun 23, 2026
Installation of approx., 10,955 LF of 16" diameter HDPE force main and required appurtenances, abandonment of the existing force main with approx., 360 CY of flowable fill, pavement, curb and gutter and sidewalk restoration, installation of 327 LF of cast in place sanitary sewer lining, 28 LF of sanitary sewer spot lining, 14 LF of sanitary sewer spot repairs and other Work.
Village of Mackinaw City
Installation of a new screening building and bar screen, installation of standby generators at the WWTP and Lakeside lift station, replacement in kind of the two (2) pumps at the Lakeside lift station, improvements to equipment in the WWTP clarifier building, upgrades to the WWTP lab building, conversion of an existing structure into a storage facility at the WWTP, installation of a bulk sodium hypochlorite storage and dosing system in the WWTP clarifier building and other Work indicated in the Contract Documents.
Posted Date
May 22, 2026
Due Date
Jun 23, 2026
Release: May 22, 2026
Village of Mackinaw City
Close: Jun 23, 2026
Installation of a new screening building and bar screen, installation of standby generators at the WWTP and Lakeside lift station, replacement in kind of the two (2) pumps at the Lakeside lift station, improvements to equipment in the WWTP clarifier building, upgrades to the WWTP lab building, conversion of an existing structure into a storage facility at the WWTP, installation of a bulk sodium hypochlorite storage and dosing system in the WWTP clarifier building and other Work indicated in the Contract Documents.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Village of Mackinaw City
The presentation provided an overview of the history of the CGC Mackinaw (WAGB 83), detailing its role as a World War II-era icebreaker and its 62-year career in the Great Lakes. The discussion covered the ship's decommissioning, its transition to a museum vessel in Mackinaw City, and the ongoing efforts of the board to preserve its legacy. Additionally, a new mission statement was introduced, and future operational plans for the museum were discussed.
The presentation provided a detailed history of the Alice's Kandy & Korn business, covering its founding in 1951 and its evolution within the local community. Key discussion topics included the origin of the shop's recipes, the business philosophy centered on retaining repeat customers, and the operational challenges of managing production and equipment. Additionally, the presentation included an announcement regarding a community time capsule project scheduled for 2025.
The council meeting addressed several major items, including a review of bids for the Clean Water State Revolving Fund sewer projects, which came in significantly over projected costs, leading to discussions on potential project scaling or re-bidding. The council also focused on land management and housing development, specifically regarding Requests for Proposals for two residential properties intended to support year-round housing. Financial actions included the approval of the fiscal year 2026-2027 budget and year-end amendments to the fiscal year 2025-2026 budget. Additionally, an appointment was made to the Planning Commission, and the council authorized necessary payments for accounts payable.
The public hearing focused on the proposed Village budget for the fiscal period from July 01, 2026, through June 30, 2027. Additionally, the council reviewed the proposed maximum allowable millage rate of 16.0156 to be levied for the budget.
The council addressed several fiscal items, including the approval of the 2026-2027 municipal budget and the authorization of year-end budget amendments for the 2025-2026 fiscal year. Key discussion topics included the appointment of a new member to the Planning Commission, a review of various departmental reports, and the authorization of accounts payable. Furthermore, the council approved a proposal to reschedule an upcoming meeting to accommodate the timeline for water and sewer project bid acceptance.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Mackinaw City's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge