Johnstown WWTP Expansion 2.4 MGD
Posted
Aug 21, 2026
Sep 24, 2026
Work includes expansion and upgra de of the wastewater treatment plant to 2.4 MGD including but limited to installing new headworks facility, new pump station with influent flow meter valve value; retrofit and upgrade of the existing aerobic granular sludge basins.
