Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: Lead with SPC/Sourcewell. Confirm your product is on a Sourcewell contract, validate Village eligibility to buy via SPC/Sourcewell, and position it as a pre-competed, compliant shortcut to avoid a formal RFP.
Village of Indian Head Park, IL. No evidence of sole source awards above $25,000; the Village operates with a strict $25,000 competitive bidding threshold.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Village of Indian Head Park's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Finance Director
Public Works Director
Village Administrator
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Village of Indian Head Park
The Project includes the following Work Replacement of an existing gas hypochlorite disinfection system with a new liquid sodium hypochlorite disinfection system.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Village of Indian Head Park
Close: Jan 27, 2026
The Project includes the following Work Replacement of an existing gas hypochlorite disinfection system with a new liquid sodium hypochlorite disinfection system.
AvailableVillage of Indian Head Park
The work consists of the rehabilitation of approx. 1,662 LF of 8" to 12" sanitary sewer through lining and all associated work. Other items of work include 1 location of sealing manholes for water infiltration using grout, cutting protruding taps, sewer flow control, traffic control and protection, sealing and adjusting manhole frames, post-construction televising inspection, final restoration, and all incidental and collateral work.
Posted Date
May 14, 2024
Due Date
Jun 4, 2024
Release: May 14, 2024
Village of Indian Head Park
Close: Jun 4, 2024
The work consists of the rehabilitation of approx. 1,662 LF of 8" to 12" sanitary sewer through lining and all associated work. Other items of work include 1 location of sealing manholes for water infiltration using grout, cutting protruding taps, sewer flow control, traffic control and protection, sealing and adjusting manhole frames, post-construction televising inspection, final restoration, and all incidental and collateral work.
Village of Indian Head Park
Work includes, but is not limited to pavement surface removal, intermittent curb and gutter removal and replacement, full-depth pavement patching, driveway removal and replacement, utility structure adjustments, resurfacing with hot-mix asphalt level binder and surface courses, grading and shaping ditches, landscape restoration, pavement markings, traffic control and protection, and all incidental and collateral work necessary to complete the project as shown on the plans. The net length of the project is approx., 2,925' (0.55 miles).
Posted Date
Feb 7, 2025
Due Date
Feb 24, 2025
Release: Feb 7, 2025
Village of Indian Head Park
Close: Feb 24, 2025
Work includes, but is not limited to pavement surface removal, intermittent curb and gutter removal and replacement, full-depth pavement patching, driveway removal and replacement, utility structure adjustments, resurfacing with hot-mix asphalt level binder and surface courses, grading and shaping ditches, landscape restoration, pavement markings, traffic control and protection, and all incidental and collateral work necessary to complete the project as shown on the plans. The net length of the project is approx., 2,925' (0.55 miles).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.