Kelly Lane Ph 1 Roadway Improvements - Grading, Utilities & Paving
Posted
-
Oct 6, 2026
Work necessary to construct roadway improvements. Work to include 1,977 SY install 8" concrete pavement; 3,068 SY install 12" lime stabilized subgrade; 92 TN hydrated lime (60#/sy); 4,071 SF install 10 mil poly; 667 SY install 3" asphalt; 465 LF install 5' sidewalk; 5 EA barrier free ramp; 876 LF striping removal; 1 LS signing and striping. See attached file.