Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Utah Department of Agriculture and Food
Delivery of 3,750 tons of cobble rock within the size range of 3-10". This project includes only the delivery of rock, not labor.
Posted Date
-
Due Date
Jun 8, 2026
Utah Department of Agriculture and Food
Close: Jun 8, 2026
Delivery of 3,750 tons of cobble rock within the size range of 3-10". This project includes only the delivery of rock, not labor.
Utah Department of Agriculture and Food
Seeking qualified and experienced contractors with the ability and equipment necessary to perform restoration work on a low-water stream crossing. Work is required to repair significant erosion damage, restore the structural integrity and safety of the crossing, and install geotextile panels to prevent further degradation caused by livestock and vehicles. The contractor must own or be able to obtain the equipment necessary to complete the work as specified below.
Posted Date
May 28, 2026
Due Date
Jun 10, 2026
Release: May 28, 2026
Utah Department of Agriculture and Food
Close: Jun 10, 2026
Seeking qualified and experienced contractors with the ability and equipment necessary to perform restoration work on a low-water stream crossing. Work is required to repair significant erosion damage, restore the structural integrity and safety of the crossing, and install geotextile panels to prevent further degradation caused by livestock and vehicles. The contractor must own or be able to obtain the equipment necessary to complete the work as specified below.
Utah Department of Agriculture and Food
Works include approx. 1,920 CY Untreated Base Course; 2,000 CY Soft Spot Repair; 400 LF of 16" PVC Pipe AWWA C-900 DR32.5; 1,100 LF 24" PVC Pipe AWWA C-900 DR32.5; 24 EA Pipe Bollard.
Posted Date
May 19, 2026
Due Date
Jun 23, 2026
Release: May 19, 2026
Utah Department of Agriculture and Food
Close: Jun 23, 2026
Works include approx. 1,920 CY Untreated Base Course; 2,000 CY Soft Spot Repair; 400 LF of 16" PVC Pipe AWWA C-900 DR32.5; 1,100 LF 24" PVC Pipe AWWA C-900 DR32.5; 24 EA Pipe Bollard.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Utah Department of Agriculture and Food
The meeting addressed strategies for managing drought conditions in agricultural operations, specifically focusing on livestock and range management. Representatives from various agencies including the Farm Service Agency, Bureau of Land Management, Natural Resources Conservation Service, and the Utah Department of Agriculture and Food discussed available programs, loan assistance for emergency situations, and long-term conservation improvements. Topics covered included livestock forage loss assistance, water transportation resources, permit flexibility for grazing allotments, and the availability of funds for infrastructure projects like water wells and fencing to improve drought resilience.
The discussion provided an update on the legislative session, which was concluding in its final week. Key legislative topics affecting agriculture that were covered included raw milk bills, a departmental cleanup bill, a predator bill, and legislation concerning cannabis, hemp, and kratom. The commissioner expressed gratitude for supporters and staff involved in these legislative efforts. Forward-looking items included monitoring floor time for bill adjustments and awaiting the release of the executive appropriation bill to see the funding allocations for all passed legislation.
The meeting included discussion and approval of the elect Ober 11 2018 board meeting minutes. A water supply report was given, discussing current conditions, snowpack, and the outlook for the winter. A feasibility report for the Davis and Weber Canal Companies was presented, addressing issues in the Kaysville area and a proposed project to install a pressure booster pump station. The Blanding City project was discussed, focusing on storm sewer system capacity and flooding issues in the city.
The meeting included discussion of program statistics, patient purchase reports, CMC internal policy for accessing information in the EVS, and recommendation verbiage. Legislative updates were provided, including patient and education updates, as well as RMP registration updates. Enhancements to the New Electronic Verification System (EVS) were also discussed.
The quarterly provider meeting included announcements and updates from Rich Oborn, Sara Lealos, Amanda Hovermale and Rebecca Brown. The topics included the ongoing meeting schedule, webpage for submitting topic ideas, cannabis therapy assessment tool, webpage for providing information about medical cannabis, University of Utah videos feedback, DOPL email, CRRB suggested use guidelines, QMP/PMP CE course discussion, compliance updates, program statistics update, EVS updates and EVS training. Questions were raised about the format of the dates in EVS, the status of the update to the "My Patient Search", PTSD audits, patient limit, address auto-fill in the payment portion and emailing medical cannabis cards again.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Utah Department of Agriculture and Food's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge