Concrete Replacement at the Combined Maintenance Activity (CMA) South, Camp Ripley, Little Falls, MN RFP
Aug 20, 2026
Closes
Sep 10, 2026
Demolition and civil (highway and heavy) construction. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Selective removal and replacement of reinforced concrete pavement panels including adjustment of existing storm sewer catch basin inlets and existing electrical hand holes. Grading and turf restoration at pavement edges.
