Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable here—deprioritize and pivot to coops.
Coops: Lead with Sourcewell or OMNIA to bypass formal sealed bids; confirm your product is on-contract and keep the process simple.
Entity: Upper Hanover Township (PA)
Status: No evidence of sole source awards; treat as non-viable.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Upper Hanover Township's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Township Manager
Township Building Inspector (LTL Consultants – Building Inspection Consultant)
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Upper Hanover Township
EQUIPMENT RENTAL Approx. 50 hours each - Bituminous paver w/operator, screed operator and two laborers - moving equipment to Township Approx. 50 hours - Two (2) Vibratory Tandem Rollers w/10 ton minimum static w/operator Each - moving equipment to Township Approx. 100 hours - Tri-Axel Dump Truck w/operator Approx. 12 hours - Skid Steer Milling Machine with milling head for milling of start, stop and driveway paving notches and sweeper with operator and two laborers - Each - moving equipment to Township Approx. 50 hours - Additional laborers and flagmen NOTE: Bituminous paver w/operator, screed operator and two laborers, vibratory tandem rollers w/10 ton minimum static w/operator, skid steer milling machine with operator and two laborers, Tri-Axel Dump Truck w/ operator and additional laborers and flagmen will be awarded to a single bidder. Approx. 12 hours - Milling machine with milling head / drum a minimum of 80” wide with operator and one laborer and clean-up /sweeping Each - moving equipment to Township Approx. 50 hours - Road Widener Midland SP-8 or equivalent.
Posted Date
Jan 28, 2026
Due Date
Feb 10, 2026
Release: Jan 28, 2026
Upper Hanover Township
Close: Feb 10, 2026
EQUIPMENT RENTAL Approx. 50 hours each - Bituminous paver w/operator, screed operator and two laborers - moving equipment to Township Approx. 50 hours - Two (2) Vibratory Tandem Rollers w/10 ton minimum static w/operator Each - moving equipment to Township Approx. 100 hours - Tri-Axel Dump Truck w/operator Approx. 12 hours - Skid Steer Milling Machine with milling head for milling of start, stop and driveway paving notches and sweeper with operator and two laborers - Each - moving equipment to Township Approx. 50 hours - Additional laborers and flagmen NOTE: Bituminous paver w/operator, screed operator and two laborers, vibratory tandem rollers w/10 ton minimum static w/operator, skid steer milling machine with operator and two laborers, Tri-Axel Dump Truck w/ operator and additional laborers and flagmen will be awarded to a single bidder. Approx. 12 hours - Milling machine with milling head / drum a minimum of 80” wide with operator and one laborer and clean-up /sweeping Each - moving equipment to Township Approx. 50 hours - Road Widener Midland SP-8 or equivalent.
AvailableUpper Hanover Township
ROAD MATERIALS - Aggregate Approx. 200 tons PA #1 Aggregate Approx. 500 tons PA #lB Aggregate Approx. 500 tons PA #2A Aggregate Approx. 500 tons PA #2B Aggregate Approx. 100 tons PA #3 Aggregate Approx. 200 tons PA #3A Aggregate Approx. 500 tons PA #4 Aggregate Approx. 500 tons PA #6 Aggregate Approx. 500 tons PA#8 Aggregate Approx. 200 tons Gabion Aggregate Approx. 200 tons Anti-Skid material Asphalt Approx. 100 tons UPM Permanent Pavement Patch Approx. 2500 tons Superpave Asphalt Mixture Design 9.5 mm, PG 64S-22, Wearing Course 0.3 to 3.0 million ESAL’s, SRL M 1 ½” Depth Approx. 1500 tons Superpave Asphalt Mixture Design 9.5 mm, PG 64E-22, Wearing Course 3.0 to 10.0 million ESAL’s, SRL M 1 ½” Depth Approx. 500 tons Superpave Asphalt Mixture Design 25.0 mm, PG 64S-22, Binder Course 0.3 to 3.0 million ESAL’s 3” Depth Approx. 500 tons Superpave Asphalt Mixture Design 19.0 mm, PG 64S-22, Wearing Course 0.3 to 3.0 million ESAL’s, SRL M-2 ½” Depth.
Posted Date
Jan 28, 2026
Due Date
Feb 10, 2026
Release: Jan 28, 2026
Upper Hanover Township
Close: Feb 10, 2026
ROAD MATERIALS - Aggregate Approx. 200 tons PA #1 Aggregate Approx. 500 tons PA #lB Aggregate Approx. 500 tons PA #2A Aggregate Approx. 500 tons PA #2B Aggregate Approx. 100 tons PA #3 Aggregate Approx. 200 tons PA #3A Aggregate Approx. 500 tons PA #4 Aggregate Approx. 500 tons PA #6 Aggregate Approx. 500 tons PA#8 Aggregate Approx. 200 tons Gabion Aggregate Approx. 200 tons Anti-Skid material Asphalt Approx. 100 tons UPM Permanent Pavement Patch Approx. 2500 tons Superpave Asphalt Mixture Design 9.5 mm, PG 64S-22, Wearing Course 0.3 to 3.0 million ESAL’s, SRL M 1 ½” Depth Approx. 1500 tons Superpave Asphalt Mixture Design 9.5 mm, PG 64E-22, Wearing Course 3.0 to 10.0 million ESAL’s, SRL M 1 ½” Depth Approx. 500 tons Superpave Asphalt Mixture Design 25.0 mm, PG 64S-22, Binder Course 0.3 to 3.0 million ESAL’s 3” Depth Approx. 500 tons Superpave Asphalt Mixture Design 19.0 mm, PG 64S-22, Wearing Course 0.3 to 3.0 million ESAL’s, SRL M-2 ½” Depth.
AvailableUpper Hanover Township
Installation of approx. 12,000 LF of 8" water main including but not limited to replacement of existing water services to curb stops/boxes, installation of water meter pits, testing and disinfection of the new water main, abandonment-in-place of the existing water main between connection points, traffic controls, erosion and sediment controls, and associated pavement and landscape restoration as shown on the construction drawings and as specified in the Project Manual. In certain instances, the work may entail replacement of water services from building to meter pit/curb stop based on service material (i.e., if existing service material determined to be lead or galvanized requiring replacement).
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Upper Hanover Township
Close: Jan 6, 2026
Installation of approx. 12,000 LF of 8" water main including but not limited to replacement of existing water services to curb stops/boxes, installation of water meter pits, testing and disinfection of the new water main, abandonment-in-place of the existing water main between connection points, traffic controls, erosion and sediment controls, and associated pavement and landscape restoration as shown on the construction drawings and as specified in the Project Manual. In certain instances, the work may entail replacement of water services from building to meter pit/curb stop based on service material (i.e., if existing service material determined to be lead or galvanized requiring replacement).