Hospital Bed Replacement Tower (RHT) Project SESP Renovations Phases F, G, H, & I Project (Request for Qualifications/ Proposals)
Jul 27, 2026
Closes
Aug 24, 2026
The SESP Renovation Phases F, G, H, I Project construction includes renovation of the interior of the SESP building (approx. 28,000 SF) and must be completed prior to the Occupancy of the upcoming Replacement Hospital Tower (RHT) project (separate project). Construction in the SESP includes but is not limited to: Phase F - 1st floor Emergency Department remodel - Build out of treatment rooms and associated Nurse Station, Dictation, Consult Rooms, Storage, etc. Phase G - 1st Floor - Reconfigure existing patient space into Pediatric ED Resuscitation, Consult, Sub Waiting, Storage, Soiled Utility, and House Keeping. Add additional Patient Toilet Room. Phase H - Basement - Demo On-Call Sleep Rooms to Expand Corridor and add Staff Toilet Room to support On Call. In Existing CPU - Convert Non Sterile Receiving to Staff Work Room. Convert Existing Storage Room to Vendor Drop Off, and Staff Work Room. Reconfigure Men's and Women's Locker & Shower rooms by expanding into adjacent office space. Phase I - Basement - Reconfigure Receiving/Breakdown, Surgical Supply, Scope Storage, and Staff Restrooms to expand Surgical Supply into the Existing CPU Staging area and widen the adjacent corridor. Reconfigure the existing GME area, Staff lounge and Locker Room to widen the adjacent corridor and provide expanded locker area. Reconfigure Existing Cart Washer for new equipment, add exhaust fan and duct to roof.
