Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Tuolumne Utilities District
Work includes 1 LS of mobilization and demobilization; 10,080 SF of 8 ft wide x 2" deep grind and remove ac; 7,040 SF of 10 ft wide x 2" deep grind and remove ac; 700 SF of 5 ft wide x 2" deep grind and remove ac; 830 SF of grind and remove hydrant/service lateral trench ac (14 places); 10,080 SF of 8 ft wide x 2" deep HMA trench paving; 7,040 SF of 10 FT wide x 2" deep HMA trench paving; 700 SF of 5 FT wide x 2" deep HMA trench paving; 830 SF of hydrant/service lateral (14 places) HMA trench paving; 12 EA of form/pour and adjust to grade concrete collars (g05 valve box).
Posted Date
May 22, 2026
Due Date
Jun 12, 2026
Release: May 22, 2026
Tuolumne Utilities District
Close: Jun 12, 2026
Work includes 1 LS of mobilization and demobilization; 10,080 SF of 8 ft wide x 2" deep grind and remove ac; 7,040 SF of 10 ft wide x 2" deep grind and remove ac; 700 SF of 5 ft wide x 2" deep grind and remove ac; 830 SF of grind and remove hydrant/service lateral trench ac (14 places); 10,080 SF of 8 ft wide x 2" deep HMA trench paving; 7,040 SF of 10 FT wide x 2" deep HMA trench paving; 700 SF of 5 FT wide x 2" deep HMA trench paving; 830 SF of hydrant/service lateral (14 places) HMA trench paving; 12 EA of form/pour and adjust to grade concrete collars (g05 valve box).
AvailableTuolumne Utilities District
Work consists of district wide patch paving. Scope includes approx 66 patches, totaling 1,686 sf requiring paving.
Posted Date
Apr 23, 2026
Due Date
May 15, 2026
Release: Apr 23, 2026
Tuolumne Utilities District
Close: May 15, 2026
Work consists of district wide patch paving. Scope includes approx 66 patches, totaling 1,686 sf requiring paving.
Tuolumne Utilities District
Work consists of construction of wastewater treatment facility (SRWWTF) filter and chlorine contact basin (CCB) cover structures (also called the filter and CCB structure project). The project will consist of the design and construction of two steel structures covering the Filters and the CCB.
Posted Date
Nov 5, 2025
Due Date
Dec 12, 2025
Release: Nov 5, 2025
Tuolumne Utilities District
Close: Dec 12, 2025
Work consists of construction of wastewater treatment facility (SRWWTF) filter and chlorine contact basin (CCB) cover structures (also called the filter and CCB structure project). The project will consist of the design and construction of two steel structures covering the Filters and the CCB.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Tuolumne Utilities District
The committee meeting focused on critical issues regarding human resources, including concerns about succession planning and the adequacy of support staff during absences. Key discussion topics included the proper public noticing and interpretation of Assembly Bill 2561, employee turnover rates, vacancy documentation, the effectiveness of exit interview processes, and the overall management of vacant positions including public relations and IT support.
The board meeting agenda includes a closed session to confer with labor negotiators regarding the Northern California District Council of Laborers' Construction, Production and Maintenance Laborers' Local Union Number 1130. Following the closed session, the board will consider a resolution to approve the Memorandum of Understanding with the aforementioned union. Regular business items feature the introduction and discussion of the Fiscal Year 2026-2027 Capital Improvement and Operating budgets, an update on District operations, and an informational presentation regarding Urban Water Management Plans.
The committee meeting focused on organizational trust, communication between staff and the board of directors, and concerns regarding accountability for results. Key topics included a review of legislative assembly bill requirements, the status of staff vacancies, employee turnover metrics, and the importance of succession planning. There was also a discussion regarding the challenges of coordinating committee meeting agendas and the management of public relations and IT functions during staff absences.
The primary agenda item concerned an easement encroachment issue at a property on Cawfield Road related to the construction of a new garage and retaining wall infringing upon a district easement. The committee discussed draft guidelines for staff to address unauthorized encroachments on TUD easements. Key discussion points included the discovery of the waterline caution tape on July 29, 2025, by a contractor who failed to follow proper underground service alert procedures. Staff sent a cease and desist order to the property owners detailing two remedy options: relocating the garage to clear the easement or relocating the district's water main. The relocation of the water main was noted as potentially involving significant cost and the need to coordinate with the State of California's Department of Transportation (CALR) right-of-way if moved to Cawfield Road. A property owner addressed the committee, explaining that a miscommunication with staff led to continued construction after they believed they had made necessary adjustments for a 5-ft offset, resulting in a nearly complete structure encroaching on the easement.
The primary discussion focused on an easement encroachment issue at a property on Coffill Road, involving unauthorized construction of a garage encroaching within a District easement and failures in following Underground Service Alert procedures. Staff reported that the garage structure was found to be approximately 4.5 feet from the District's water main, and a cease-and-desist letter was issued. The committee also reviewed draft guidelines and a flowchart for staff to address future unauthorized encroachments on District easements and underground facilities. The Committee recommended that the item be presented to the Board for review and determination of next steps.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Tuolumne Utilities District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge