Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Prosper
Work includes 1 LS 2 general site preparation, clearing, and disposal; 5 EA 3 furnish and install new sign and sign post assembly; 4 EA furnish, install, and maintain project sign; 6 EA furnish, install, maintain, and remove inlet protection; 2,250 SF construct median nose paving (stamped and stained) (p-1); 2 EA construct maintenance ramp (p-2), including all incidentals; 1,265 LF furnish and install steel edge (m-1); 5,640 SF furnish and install decorative gravel (colorado river rock) (ag-1); 1,675 SF furnish and install decorative gravel (gray granite or basalt) (ag-2). See outside link.
Posted Date
May 22, 2026
Due Date
Jun 23, 2026
Release: May 22, 2026
Town of Prosper
Close: Jun 23, 2026
Work includes 1 LS 2 general site preparation, clearing, and disposal; 5 EA 3 furnish and install new sign and sign post assembly; 4 EA furnish, install, and maintain project sign; 6 EA furnish, install, maintain, and remove inlet protection; 2,250 SF construct median nose paving (stamped and stained) (p-1); 2 EA construct maintenance ramp (p-2), including all incidentals; 1,265 LF furnish and install steel edge (m-1); 5,640 SF furnish and install decorative gravel (colorado river rock) (ag-1); 1,675 SF furnish and install decorative gravel (gray granite or basalt) (ag-2). See outside link.
AvailableTown of Prosper
Work includes 1 LS 2 general site preparation, clearing, and disposal; 5 EA 3 furnish and install new sign and sign post assembly; 4 EA furnish, install, and maintain project sign; 6 EA furnish, install, maintain, and remove inlet protection; 2,250 SF construct median nose paving (stamped and stained) (p-1); 2 EA construct maintenance ramp (p-2), including all incidentals; 1,265 LF furnish and install steel edge (m-1); 5,640 SF furnish and install decorative gravel (colorado river rock) (ag-1); 1,675 SF furnish and install decorative gravel (gray granite or basalt) (ag-2). See outside link.
Posted Date
May 22, 2026
Due Date
Jun 23, 2026
Release: May 22, 2026
Town of Prosper
Close: Jun 23, 2026
Work includes 1 LS 2 general site preparation, clearing, and disposal; 5 EA 3 furnish and install new sign and sign post assembly; 4 EA furnish, install, and maintain project sign; 6 EA furnish, install, maintain, and remove inlet protection; 2,250 SF construct median nose paving (stamped and stained) (p-1); 2 EA construct maintenance ramp (p-2), including all incidentals; 1,265 LF furnish and install steel edge (m-1); 5,640 SF furnish and install decorative gravel (colorado river rock) (ag-1); 1,675 SF furnish and install decorative gravel (gray granite or basalt) (ag-2). See outside link.
AvailableTown of Prosper
Work consist of 6500 CY of borrow material, 11200 CY of unclassified street excavation, 7648 sy of remove & dispose ex. Asphalt pavement, 95 SY of remove & dispose ex. Concrete pavement, 118 LF of remove & dispose ex. Culvert, 2 EA of remove & dispose ex. Headwall, 398 LF of remove & dispose of ex. Barbed wire fence, 32 EA of remove & dispose of ex. Trees (6"), 107 SY of remove & dispose of ex. Stone riprap, 16435 SY of 9-inch thick 4000 psi reinforced concrete pavement, 73 SY of 7 6-inch thick 4000 psi reinforced concrete pavement. See outside link.
Posted Date
Mar 20, 2026
Due Date
Apr 14, 2026
Release: Mar 20, 2026
Town of Prosper
Close: Apr 14, 2026
Work consist of 6500 CY of borrow material, 11200 CY of unclassified street excavation, 7648 sy of remove & dispose ex. Asphalt pavement, 95 SY of remove & dispose ex. Concrete pavement, 118 LF of remove & dispose ex. Culvert, 2 EA of remove & dispose ex. Headwall, 398 LF of remove & dispose of ex. Barbed wire fence, 32 EA of remove & dispose of ex. Trees (6"), 107 SY of remove & dispose of ex. Stone riprap, 16435 SY of 9-inch thick 4000 psi reinforced concrete pavement, 73 SY of 7 6-inch thick 4000 psi reinforced concrete pavement. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: If your offer is on OMNIA Partners or BuyBoard, piggyback. For IT/software, route via Texas DIR through SHI Government Solutions.
Town of Prosper, TX regularly approves sole source for proprietary IT/software and specialized maintenance. Work with Purchasing to complete the sole source justification form and cite continuity of service or exclusivity. Examples: $126,215 public safety records management system with Integrated Computer Systems, Inc.
Board meetings and strategic plans from Town of Prosper
The agenda for the meeting includes updates on America 250, reports from the Community Engagement Committee subcommittees, and updates regarding special events. Additionally, the committee will cover the Voice of the Town program, discuss and consider the CEC Top 3 and save the date items, and accept requests for future agenda topics.
The agenda includes receiving comments from citizens, reviewing the financial report, and discussing updates on new business ventures. The board will confirm or adjust the schedule for the subsequent meeting and move into a closed session to deliberate on economic development negotiations, real estate matters, and personnel considerations, including executive director staffing, before reconvening for any necessary actions.
The meeting included several recognitions for local achievements, such as student sport championships, the Eagle Scout rank, and the 2026 Mayor's Youth Advisory Council. Consent agenda items covered the acceptance of a monthly financial report, the purchase of multipurpose speed trailers, and authorization for public safety media storage and police taser equipment. The Council also considered grants for road safety, fire department equipment, and various development-related agreements and rezoning requests. A public hearing was scheduled regarding a Specific Use Permit for an extended-stay hotel, alongside contracts for construction services for the Legacy Drive project. Furthermore, the agenda included discussions on economic development incentives, property matters, and legal consultations during an executive session.
The meeting includes presentations on the America 250 initiative, Hometown Heroes, and a proclamation for National Public Safety Telecommunicators Week. The consent agenda features contracts for wastewater line smoke testing and manhole rehabilitation, an amendment to speed limit ordinances, and installation of park equipment. Additionally, the Council will consider a process for appealing decisions made by the Planning and Zoning Commission and receive subcommittee reports. The executive session is scheduled to discuss economic development incentives, real estate, personnel matters, security, board/commission appointments, and consultation with the town attorney regarding litigation.
The meeting includes the introduction of new staff members, discussions regarding board leadership and governance, including membership updates, meeting schedules, and orientation. The agenda covers a report on library operations and initiatives, a review of draft qualifications for architectural and design services for facility improvements, a presentation on the 2027-2030 Long Range Plan, and discussions on library awards, reporting, visibility, and upcoming events.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Prosper's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant Director of Engineering Services – Capital Projects
Premium
Access the largest public sector contact database
© 2026 Starbridge