Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Pendleton
Services consist of weekly pick-up of containerized Solid Waste, and bi-weekly curbside Recycling from Residential Units within the geographic limits of the Town and disposal of said materials. The Services shall include Solid Waste and Recycling collection and disposal for designated Town Facilities. Contract Sum for one (1) year.
Posted Date
May 14, 2026
Due Date
Jun 15, 2026
Release: May 14, 2026
Town of Pendleton
Close: Jun 15, 2026
Services consist of weekly pick-up of containerized Solid Waste, and bi-weekly curbside Recycling from Residential Units within the geographic limits of the Town and disposal of said materials. The Services shall include Solid Waste and Recycling collection and disposal for designated Town Facilities. Contract Sum for one (1) year.
AvailablePendleton Utility Office
Work includes site grading, detention/retention areas, and erosion control measures. Installation of substation security fencing. Erection of 69kV and 15kV steel bus structures, bus work, and associated equipment. Erection of overhead static wires and supporting structures for substation lightning protection. Installation of all above and below grade substation grounding and foundations. Installation of AC and DC control and power cables. Installation of the secondary containment systems around the new and existing station transformer. Installation of all junction boxes, conduit, and raceway (above and below grade). Installation of 15kV feeder exit circuits to designated locations outside the substation yard fence. Receive, unload, move, store and install all owner furnished materials specified or indicated.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Pendleton Utility Office
Close: Jan 8, 2026
Work includes site grading, detention/retention areas, and erosion control measures. Installation of substation security fencing. Erection of 69kV and 15kV steel bus structures, bus work, and associated equipment. Erection of overhead static wires and supporting structures for substation lightning protection. Installation of all above and below grade substation grounding and foundations. Installation of AC and DC control and power cables. Installation of the secondary containment systems around the new and existing station transformer. Installation of all junction boxes, conduit, and raceway (above and below grade). Installation of 15kV feeder exit circuits to designated locations outside the substation yard fence. Receive, unload, move, store and install all owner furnished materials specified or indicated.
Pendleton Utility Office
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Pendleton Utility Office
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Don’t pursue; pivot to Sourcewell due to low thresholds/high friction.
Coops: Use Sourcewell now if your product/partner is on contract; confirm applicability with the Clerk-Treasurer.
Town of Pendleton, IN. No evidence of sole source awards in public records; deprioritize this path. No sole source dollar threshold identified.
Board meetings and strategic plans from Town of Pendleton
The commission discussed the withdrawal of a rezoning petition by Mr. Petar and confirmed that the town has issued cease and desist letters regarding commercial activity on the property. The commission also reviewed the economic development agreement for the Heritage Hub commercial subdivision, which includes a developer-backed bond for the site's commercial development and construction of two hotels. The discussion highlighted the alignment of the proposed development with the town's comprehensive plan and future land use map, specifically regarding regional commercial development.
The commission discussed an update on the ATL project right-of-way and the successful acquisition of INDOT funding for a future sidewalk path. Additionally, the commission presented a declaratory resolution for the new Heritage Hub economic development area. This included a project proposal from developers regarding the construction of a Fairfield by Marriott hotel and other commercial lots, as well as the proposed financial structure for developer-backed bonds and tax increment financing allocations.
The meeting focused on updates regarding invasive species management events, including community outreach and collaboration with local partners. The committee discussed the tracking of invasive species removal data and future scheduled events. Additionally, there was a review of local educational programs involving tree identification and environmental stewardship initiatives, specifically emphasizing urban forestry efforts and tree maintenance documentation.
The Board of Zoning Appeals held a hearing to address requests for accessory structures. One petition involved building a garage at 331 South Broadway, seeking variances for height, exterior siding materials, and access point. A second petition for 6290 South 425 West requested variances for a larger accessory structure footprint, height, and the use of exposed fastener metal siding. The Board approved both petitions, finding they met the required criteria, including consistency with existing property conditions and no adverse impact on the public.
The Council conducted an election of officers, selecting a new president and vice president. The clerk treasurer provided a financial report, noting increased expenditures due to seasonal preparations such as pool opening, equipment purchases for the fire department, and golf course maintenance. The Parks Department reported on invasive management initiatives, summer programming, pool operations, and the installation of safety features at the pickleball court. The Planning Department discussed building permit productivity, adjustments required by new state legislation regarding development and reporting, and the status of various zoning petitions, historic preservation projects, urban forestry goals, and road impact planning.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Pendleton's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge