Town of Milford CCMG27 RFP
Posted
-
Dec 14, 2026
The proposed construction will include ADA ramp construction, HMA patching, milling of the existing roadway with a 1.5-inch HMA surface overlay along with pavement markings and all incidental work required, as more fully specified in the Contract Documents and Plans.

