The proposed construction will include milling, HMA Surface overlay, sidewalk, curb ramps, and all incidental work required, as more fully specified in the Contract Documents and Plans.
Description: The proposed construction will include ADA ramp construction, HMA patching, milling of the existing roadway with a 1.5-inch HMA surface overlay along with pavement markings and all incidental work required, as more fully specified in the Contract Documents and Plans.
City · IN, US
Decision makers connected to this RFP from Town of Milford.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityIN
Posted
-
Dec 15, 2026
The proposed construction will include milling, HMA Surface overlay, sidewalk, curb ramps, and all incidental work required, as more fully specified in the Contract Documents and Plans.
CityIN
Posted
-
Dec 15, 2026
The proposed construction will include 1.5” HMA milling of the existing roadways along with a 1.5-inch HMA Surface overlay, sidewalks, and all incidental work required, as more fully specified in the Contract Documents and Plans.
CityIN
Posted
Nov 24, 2026
Dec 16, 2026
1.5" HMA milling of the existing roadways along with a 1.5" HMA Surface overlay, sidewalks, and all incidental work.
CityIN
Posted
Nov 18, 2026
Dec 17, 2026
Work includes approx. of 2,600 SY of milling asphalt, 2"; 295 TON of HMA, 2, 58S, surface, 9.5 mm; 90 TON of HMA patching, full depth, type B; 1 TON of asphalt for tack coat.