Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Cambridge
Provide west river trunk sanitary access road - clearing & grubbing. The work includes the clearing and grubbing of vegetation along a city owned sanitary trunk sewer that runs along an easement on private property. The clearing and grubbing is being completed in preparation of the construction of an access road. The total length of the clearing and grubbing is approx. 500 meters by approx. 14 meters wide. There are 180 trees proposed for removal.
Posted Date
Feb 3, 2026
Due Date
Feb 19, 2026
Release: Feb 3, 2026
Town of Cambridge
Close: Feb 19, 2026
Provide west river trunk sanitary access road - clearing & grubbing. The work includes the clearing and grubbing of vegetation along a city owned sanitary trunk sewer that runs along an easement on private property. The clearing and grubbing is being completed in preparation of the construction of an access road. The total length of the clearing and grubbing is approx. 500 meters by approx. 14 meters wide. There are 180 trees proposed for removal.
Town of Cambridge
Provide cured-in-place-pipe (CIPP) watermain rehabilitation. The rehabilitation of approx. 140m of 150mm & 1166m of 250mm water main and 600m of 200mm water main primarily using cured-in-place-pipe (cipp) lining and includes replacement of water services, replacement of appurtenances, and other miscellaneous works for the rehabilitation of asbestos cement and thin-walled cast iron water mains. Additionally, this tender includes the provisional scope for rehabilitation of approx. 65m of 200mm water main primarily using cured-in-place-pipe (CIPP) lining and includes replacement of appurtenances, and other miscellaneous works for the rehabilitation of cast iron water mains and reconnection of water service following lining operations. See outside link.
Posted Date
Feb 6, 2026
Due Date
Feb 27, 2026
Release: Feb 6, 2026
Town of Cambridge
Close: Feb 27, 2026
Provide cured-in-place-pipe (CIPP) watermain rehabilitation. The rehabilitation of approx. 140m of 150mm & 1166m of 250mm water main and 600m of 200mm water main primarily using cured-in-place-pipe (cipp) lining and includes replacement of water services, replacement of appurtenances, and other miscellaneous works for the rehabilitation of asbestos cement and thin-walled cast iron water mains. Additionally, this tender includes the provisional scope for rehabilitation of approx. 65m of 200mm water main primarily using cured-in-place-pipe (CIPP) lining and includes replacement of appurtenances, and other miscellaneous works for the rehabilitation of cast iron water mains and reconnection of water service following lining operations. See outside link.
AvailableTown of Cambridge
Culvert Replacement on the Upper Pleasant Valley Road. Replacement of a 48” CMP with an 81” X 59” Pipe Arch to be supplied by the owner, following Hydraulic Study provided by the owner. Pavement replacement to match existing thickness to be determined by owner/contractor during excavation and to be included separately and as a lump sum bid. Condition of existing CMP will determine final storage/disposal determined by the owner The Project has a contractual duration of 30 days. Construction of all work must be completed before September 22, 2025.
Posted Date
Jul 25, 2025
Due Date
Aug 5, 2025
Release: Jul 25, 2025
Town of Cambridge
Close: Aug 5, 2025
Culvert Replacement on the Upper Pleasant Valley Road. Replacement of a 48” CMP with an 81” X 59” Pipe Arch to be supplied by the owner, following Hydraulic Study provided by the owner. Pavement replacement to match existing thickness to be determined by owner/contractor during excavation and to be included separately and as a lump sum bid. Condition of existing CMP will determine final storage/disposal determined by the owner The Project has a contractual duration of 30 days. Construction of all work must be completed before September 22, 2025.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; only attempt if truly last-resort and defensible—otherwise revert to the formal bid path.
Coops: If they’re open to coops, suggest OMNIA Partners, NASPO ValuePoint, Sourcewell, or HGACBuy to simplify.
Town of Cambridge, VT. No sole source dollar thresholds are publicly documented. The town avoids sole source and VLCT guidance treats it as a last resort.
Track Town of Cambridge's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Cambridge's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Town Administrator; also Highway Manager/Road Foreman
Premium
Access the largest public sector contact database