Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Topsfield Housing Authority
Project consists of but not limited to: remove and reconstruct parking lot, drive aisle, and bituminous sidewalks. Construct new concrete ramps and stairs with MAAB compliant handrails. Remove existing site lighting and disconnect conduit. Install new light poles, fixtures, bollard lights, and light wall packs. Install new light footings, conduits, and electrical infrastructure.
Posted Date
Jun 24, 2026
Due Date
Jul 15, 2026
Release: Jun 24, 2026
Topsfield Housing Authority
Close: Jul 15, 2026
Project consists of but not limited to: remove and reconstruct parking lot, drive aisle, and bituminous sidewalks. Construct new concrete ramps and stairs with MAAB compliant handrails. Remove existing site lighting and disconnect conduit. Install new light poles, fixtures, bollard lights, and light wall packs. Install new light footings, conduits, and electrical infrastructure.
AvailableTopsfield Housing Authority
The Topsfield Housing Authority seeks designer services for a Windows, Siding, and Trim project at its 667-01 Little Brook Village development in Topsfield, MA. The scope includes investigation of existing conditions, initial design, preparation of contract documents, bidding assistance, and construction administration. Documents are available via the Massachusetts Designer Selection Board’s Designer Selection Network, and applications are due January 21, 2026 at 2:00 PM ET via COMMBUYS.
Posted Date
Dec 31, 2025
Due Date
Jan 21, 2026
Release: Dec 31, 2025
Topsfield Housing Authority
Close: Jan 21, 2026
The Topsfield Housing Authority seeks designer services for a Windows, Siding, and Trim project at its 667-01 Little Brook Village development in Topsfield, MA. The scope includes investigation of existing conditions, initial design, preparation of contract documents, bidding assistance, and construction administration. Documents are available via the Massachusetts Designer Selection Board’s Designer Selection Network, and applications are due January 21, 2026 at 2:00 PM ET via COMMBUYS.
Topsfield Housing Authority
The work consists of a complete renovation of an existing one-bedroom unit, including kitchen and bath. Replace split-system heat pump. Asbestos abatement is required.
Posted Date
Apr 9, 2025
Due Date
Apr 25, 2025
Release: Apr 9, 2025
Topsfield Housing Authority
Close: Apr 25, 2025
The work consists of a complete renovation of an existing one-bedroom unit, including kitchen and bath. Replace split-system heat pump. Asbestos abatement is required.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Topsfield Housing Authority
The board discussed the cancellation of a bid due to incomplete asbestos testing and agreed to revise the project scope for future re-bidding. They approved a motion to waive regular meetings during July, August, and December, opting for special meetings as needed. The board reviewed June payables and received the Managing Director's report. A discussion regarding the restructuring of common area shed usage was tabled. Additionally, the board considered a request from residents to avoid fertilizing grass to preserve existing clover patches on the property.
The meeting included the approval of an invoice for a water heater project and the discussion of bank account changes. The board reviewed February payables, including invoices for window repairs, administrative software services, and an annual audit. Discussions were held regarding the budget and funding disbursement for the LTO, as well as an update on administrative vacancies and the status of the applicant waitlist. Additionally, the board discussed the search for a grant writer and potential efforts to secure earmarked state funding.
The board reviewed a check summary totaling $35,433.30 and received an update from the Executive Director regarding property vacancies and applicant waitlist statistics. Additionally, the board reviewed and signed revised year-end documents.
The board reviewed several ongoing capital modification projects, including paving, siding, shower conversions, and building maintenance. Management discussed the prioritization of paving and siding projects and the pursuit of grant funding and financial assistance. The board also reviewed the executive director's report covering administrative vacancies, waitlist statistics, and operating statements. Additionally, the board addressed a request for funding from the Local Tenant Association and established liability requirements for an upcoming tenant event.
The board reviewed the check summary for December and received the Executive Director's report, which included updates on unit vacancies, the current status of the waitlist, and the November operating statement. The board also approved a new five-year management agreement with the Georgetown Housing Authority.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Topsfield Housing Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge