PLC Replacement Program Phase 3
Aug 3, 2026
Closes
Sep 3, 2026
To procure a qualified, professional licensed contractor that has met all minimum requirements as stated in part 1 minimum requirements section of this document. Engineering and submittals, material procurement, factory assembly, plc programming & panel oit programming, hardware and software factory acceptance testing, replacement of existing plc panels, electrical conduit and cable installation, fiber optic cable, field testing, commissioning, training within the existing remote csu/ nsu lift station facilities, and complete as-built drawings.