Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Taylor Bay Beach Home Owner's Association (HOA)
Installation of 1,500 LF of new 8" SDR-11 HDPE concrete-anchored outfall pipe and diffuser assembly in case inlet, south puget sound. With 1,300' of submerged, surface-run pipe, 200' of intermittently submerged pipe through the inter-tidal zone, and a stub-out anchored to the bluff face at a min. elevation of 15' for future connection. Alternate bid item included for installation of large woody debris to provide shoreline outfall protection.
Posted Date
May 8, 2026
Due Date
Jun 1, 2026
Release: May 8, 2026
Taylor Bay Beach Home Owner's Association (HOA)
Close: Jun 1, 2026
Installation of 1,500 LF of new 8" SDR-11 HDPE concrete-anchored outfall pipe and diffuser assembly in case inlet, south puget sound. With 1,300' of submerged, surface-run pipe, 200' of intermittently submerged pipe through the inter-tidal zone, and a stub-out anchored to the bluff face at a min. elevation of 15' for future connection. Alternate bid item included for installation of large woody debris to provide shoreline outfall protection.
AvailableTaylor Bay Beach Home Owner's Association (HOA)
Schedule A: Installation of approximately 1,175 feet of 8-inch Cured-in-Place-Pipe (CIPP) and 570 feet of 6-inch CIPP in concrete sewer pipe. Three separate areas are designated for CIPP installation.Schedule B: Installation of approximately 3,425 feet of 8-inch Cured-in-Place-Pipe (CIPP) and 575 feet of 6-inch CIPP in concrete sewer pipe. Five separate areas are designated for CIPP installation.
Posted Date
Jul 31, 2025
Due Date
Aug 14, 2025
Release: Jul 31, 2025
Taylor Bay Beach Home Owner's Association (HOA)
Close: Aug 14, 2025
Schedule A: Installation of approximately 1,175 feet of 8-inch Cured-in-Place-Pipe (CIPP) and 570 feet of 6-inch CIPP in concrete sewer pipe. Three separate areas are designated for CIPP installation.Schedule B: Installation of approximately 3,425 feet of 8-inch Cured-in-Place-Pipe (CIPP) and 575 feet of 6-inch CIPP in concrete sewer pipe. Five separate areas are designated for CIPP installation.
Taylor Bay Beach Home Owner's Association (HOA)
Preconstruction services, equipment supply, construction services, and post-construction services for the membrane equipment for a new wastewater treatment facility.
Posted Date
Feb 4, 2025
Due Date
Feb 18, 2025
Release: Feb 4, 2025
Taylor Bay Beach Home Owner's Association (HOA)
Close: Feb 18, 2025
Preconstruction services, equipment supply, construction services, and post-construction services for the membrane equipment for a new wastewater treatment facility.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge