Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Tate County
The scope of work of this project consists of demolition of existing asphalt driveway and concrete parking lot, removal of storm drain inlet and pipe, construction of new asphalt driveways and concrete parking lot with sidewalk, curb & gutter, and line striping.
Posted Date
-
Due Date
Apr 15, 2026
Tate County
Close: Apr 15, 2026
The scope of work of this project consists of demolition of existing asphalt driveway and concrete parking lot, removal of storm drain inlet and pipe, construction of new asphalt driveways and concrete parking lot with sidewalk, curb & gutter, and line striping.
AvailableTate County
The scope of work of this project consists of grade, drain, base and pavement construction of Drive approx. 100 ft. north of its current location.
Posted Date
-
Due Date
Apr 15, 2026
Release: -
Tate County
Close: Apr 15, 2026
The scope of work of this project consists of grade, drain, base and pavement construction of Drive approx. 100 ft. north of its current location.
AvailableTate County
Work includes concrete and/or asphalt paving, curbs and gutters, fencing, site drainage, concrete foundation work, a metal pole barn and installation of utilities including a water line, a 1,000 gallon propane tank and gas lines.
Posted Date
Mar 4, 2026
Due Date
Mar 26, 2026
Release: Mar 4, 2026
Tate County
Close: Mar 26, 2026
Work includes concrete and/or asphalt paving, curbs and gutters, fencing, site drainage, concrete foundation work, a metal pole barn and installation of utilities including a water line, a 1,000 gallon propane tank and gas lines.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $5,000, use sole source.
Coops: Move to a cooperative path to avoid the >$5,000 two-bid requirement. If they’re open to coops, mention MS DFA statewide contracts, NASPO ValuePoint, Sourcewell, and TIPS as fast, compliant options. Buyer hasn’t historically used coops/resellers, but you can encourage them to explore these procurement programs and these resellers as future options.
Tate County, MS: No practical sole source path identified. There is no evidence of past sole source awards and flexibility appears limited.
Board meetings and strategic plans from Tate County
The Tate County Comprehensive Plan, a long-range guide extending 20 to 25 years, aims to establish a common vision for the county's future by promoting the health, safety, and general welfare of its residents. It focuses on critical areas including community facilities, transportation, and land use, with the objective of fostering controlled and manageable growth. Key strategic goals involve improving transportation and public safety, encouraging economic development, preventing land overcrowding, and enhancing the quality of life, while protecting natural and built assets and optimizing public investments.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Tate County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Head, Tate County Economic Development Foundation (contracted via 2EQLAST Consulting)
Premium
Access the largest public sector contact database