Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Tampa-Hillsborough Expressway Authority
Consultants interested in providing traffic and revenue services to the authority.
Posted Date
Feb 24, 2026
Due Date
Mar 31, 2026
Release: Feb 24, 2026
Tampa-Hillsborough Expressway Authority
Close: Mar 31, 2026
Consultants interested in providing traffic and revenue services to the authority.
AvailableTampa-Hillsborough Expressway Authority
The authority seeks to expand ITS infrastructure on the expressway to create full coverage for its traffic incident management system, ultimately providing the authority with real-time data to support and enhance system operations, safety, asset management, emergency response and management, and long-term planning. The Authority also seeks to improve the existing lighting system and implement additional traffic safety measures along its system. The proposed scope of work for this Project consists of designing and building (i) a full-coverage ITS system on the Expressway, inclusive of ancillary structural work necessary for the installation of such ITS equipment, (ii) an upgraded lighting system along the corridor, and (iii) roadway improvements such as existing pavement resurfacing and placement of rumble strips on shoulders.
Posted Date
Jan 8, 2026
Due Date
Mar 2, 2026
Release: Jan 8, 2026
Tampa-Hillsborough Expressway Authority
Close: Mar 2, 2026
The authority seeks to expand ITS infrastructure on the expressway to create full coverage for its traffic incident management system, ultimately providing the authority with real-time data to support and enhance system operations, safety, asset management, emergency response and management, and long-term planning. The Authority also seeks to improve the existing lighting system and implement additional traffic safety measures along its system. The proposed scope of work for this Project consists of designing and building (i) a full-coverage ITS system on the Expressway, inclusive of ancillary structural work necessary for the installation of such ITS equipment, (ii) an upgraded lighting system along the corridor, and (iii) roadway improvements such as existing pavement resurfacing and placement of rumble strips on shoulders.
Tampa-Hillsborough Expressway Authority
Work includes 1 EA patch/repair damage to the exterior insulation and finish system (efis) on both buildings. Remove only damaged portions of the efis system in its entirety to concrete masonry unit substrate and patch/repair efis in-kind to match adjacent surfaces to remain; 1 EA inspect and investigate cause of through wall water intrusion at aluminum windows. Repair or replace aluminum windows, as required, to eliminate water intrusion into buildings. Provide and install metal flashing at exterior sills of aluminum windows to slope provide positive slope over the face of the building; 1 EA remove and replace exterior sealant at the perimeter of windows and doors.
Posted Date
Nov 7, 2025
Due Date
Dec 19, 2025
Release: Nov 7, 2025
Tampa-Hillsborough Expressway Authority
Close: Dec 19, 2025
Work includes 1 EA patch/repair damage to the exterior insulation and finish system (efis) on both buildings. Remove only damaged portions of the efis system in its entirety to concrete masonry unit substrate and patch/repair efis in-kind to match adjacent surfaces to remain; 1 EA inspect and investigate cause of through wall water intrusion at aluminum windows. Repair or replace aluminum windows, as required, to eliminate water intrusion into buildings. Provide and install metal flashing at exterior sills of aluminum windows to slope provide positive slope over the face of the building; 1 EA remove and replace exterior sealant at the perimeter of windows and doors.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Tampa-Hillsborough Expressway Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director of Strategy, Communications, and Community Engagement
Premium
Access the largest public sector contact database