Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Suffield Public Schools
Project consists of the partial removal and replacement of a roof at an existing building. See attached files.
Posted Date
Jul 29, 2026
Due Date
Jul 28, 2026
Release: Jul 29, 2026
Suffield Public Schools
Close: Jul 28, 2026
Project consists of the partial removal and replacement of a roof at an existing building. See attached files.
AvailableSuffield Public Schools
Work consists of a photovoltaic system installation on the roof of an existing building, including all associated accessories and components for a complete installation. The Work includes: Provision and installation of new photovoltaic panels, inverters, racking, and all associated wiring/raceway, including tie-ins to existing service and PV switch. Offsite disposal of all removed materials. The Work will also include the cutting, removing, replacing, patching and repairing of the existing roofing system by methods and with materials and using existing roofing contractor so as not to void the existing roof warranty. See attached files.
Posted Date
Jun 29, 2026
Due Date
Jul 28, 2026
Release: Jun 29, 2026
Suffield Public Schools
Close: Jul 28, 2026
Work consists of a photovoltaic system installation on the roof of an existing building, including all associated accessories and components for a complete installation. The Work includes: Provision and installation of new photovoltaic panels, inverters, racking, and all associated wiring/raceway, including tie-ins to existing service and PV switch. Offsite disposal of all removed materials. The Work will also include the cutting, removing, replacing, patching and repairing of the existing roofing system by methods and with materials and using existing roofing contractor so as not to void the existing roof warranty. See attached files.
AvailableSuffield Public Schools
DESIGN-BUILD replacement of eighteen (18) hvac/roof top units to improve indoor air quality
Posted Date
Nov 23, 2024
Due Date
Jan 23, 2025
Release: Nov 23, 2024
Suffield Public Schools
Close: Jan 23, 2025
DESIGN-BUILD replacement of eighteen (18) hvac/roof top units to improve indoor air quality
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable; reposition as a pre-competed cooperative purchase.
Coops: Encourage exploration of CT DAS Statewide Contracts (CTsource), CREC MarketPlace, EASTCONN Cooperative Purchasing, or OMNIA Partners to expedite. If co-op not available/declined: Monitor bid portals and prepare to compete via formal sealed bid (> $15,000).
Suffield Public Schools, CT: No evidence of sole source usage; path not viable.
Thresholds: None specified for sole source. Sealed bids are triggered at a low $15,000 competitive bidding threshold.
Board meetings and strategic plans from Suffield Public Schools
The subcommittee reviewed several policies, including revisions to Library Policy/Regulation #6161.1 and #6161.12, Graduation Requirements regarding U.S. History, and Ages of Attendance policy, which involved removing redundant text. These policies are slated for a first reading at the next full Board meeting. The committee also identified future business related to Instruction/Community Relations.
The Board of Education meeting focused on student and staff recognitions, including student representatives and retiring faculty. Public comments addressed STEM education and high school scheduling flexibility. Discussions included the A. Ward Spaulding and McAlister Intermediate schools year-end reviews, kindergarten enrollment projections for the upcoming school year, and potential cell phone restrictions at the high school. Additionally, the Board reviewed the Suffield Middle School building project timeline, approved a preschool tuition increase, and received updates on the current fiscal year financial status.
The board discussed and considered action on several items, including school lunch pricing for the 2026-27 school year and the extension of the M&J contract. Project management topics included the review and potential approval of final plans, manuals, and cost estimates for the roof replacement and photovoltaic projects at Suffield High School. Furthermore, the board addressed personnel matters during an executive session, specifically regarding terms of employment for non-affiliated staff and the evaluation and contract status of the Superintendent.
The meeting focused on several key financial and operational updates. Discussions included the current district budget deficit caused by unbudgeted special education costs and strategies to address it. An update on the transportation contract was provided, noting favorable terms and costs, along with plans for summer capital improvements in food service and various facilities projects. Additionally, the subcommittee reviewed the progress of the Suffield Middle School building project, with plans for public communication regarding these updates.
The meeting focused on the implementation plan for the Amplify ELA program, which integrates existing units with a new 100-day pathway aligned with the Science of Reading. Additionally, the committee reviewed a new framework for Tier 1 instruction consisting of five pillars to guide classroom practice and professional development. Updates were provided on the progress of making curriculum information publicly available on the school website as required by the state. Finally, the committee discussed the status of summer curriculum writing projects, noting that 29 proposals are currently under review.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Suffield Public Schools's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant Superintendent for Curriculum and Instruction
Premium
Access the largest public sector contact database
© 2026 Starbridge