Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Stoneham Housing Authority
Remove and replace the front entry doors at 48 units total and remove/dispose of existing storm doors and provide new storm doors.
Posted Date
Mar 25, 2026
Due Date
Apr 9, 2026
Release: Mar 25, 2026
Stoneham Housing Authority
Close: Apr 9, 2026
Remove and replace the front entry doors at 48 units total and remove/dispose of existing storm doors and provide new storm doors.
AvailableStoneham Housing Authority
Remove the existing interior wall-mounted mailboxes from ten existing buildings and replace them with new exterior pedestal-mounted mailboxes to be installed on the existing concrete pads.
Posted Date
Mar 11, 2026
Due Date
Mar 26, 2026
Release: Mar 11, 2026
Stoneham Housing Authority
Close: Mar 26, 2026
Remove the existing interior wall-mounted mailboxes from ten existing buildings and replace them with new exterior pedestal-mounted mailboxes to be installed on the existing concrete pads.
Stoneham Housing Authority
Conversion of 4 first-floor units to accessible units in 2 multifamily buildings. Gut renovation of unit interiors including new drywall, insulation, finishes, fixtures, and electrical. New unit load centers and feeder wires. Mold and asbestos remediation. Site work for accessibility including grading, new walkways and accessible parking areas. Filed sub bids are required for plumbing, electrical, painting and resilient flooring.
Posted Date
-
Due Date
Mar 17, 2025
Release: -
Stoneham Housing Authority
Close: Mar 17, 2025
Conversion of 4 first-floor units to accessible units in 2 multifamily buildings. Gut renovation of unit interiors including new drywall, insulation, finishes, fixtures, and electrical. New unit load centers and feeder wires. Mold and asbestos remediation. Site work for accessibility including grading, new walkways and accessible parking areas. Filed sub bids are required for plumbing, electrical, painting and resilient flooring.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Stoneham Housing Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database