Mohawk Paving & ADA RFP
Aug 10, 2026
Closes
Aug 27, 2026
Work consists of 1 LS temporary work zone traffic control, complete; 1 LS erosion control; 1 EZ minor adjustment of manholes; 2,707 SY cold plane pavement removal, 4" deep; 143 LF concrete curbs, curb and gutter; 264 LF 4" concrete sidewalk; 24 EA 4" white mono-directional type 1 reflectors; 1 LS traffic signal modification, Q st and mohawk blvd ramps; 23 SY lawn seeding.