Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Southern Ute Indian Tribe
Work includes : rehabilitation of 12,500 feet of 8" sanitary sewer pipeline using both pipe bursting and trenched techniques. Reconnection of approx 70 user services will be required. Rehabilitation of select manhole structures will be required. Project will require bypass sewage pumping, site stabilization, and all associated work to deliver a complete functional sewer system.
Posted Date
Jun 13, 2025
Due Date
Jul 10, 2025
Release: Jun 13, 2025
Southern Ute Indian Tribe
Close: Jul 10, 2025
Work includes : rehabilitation of 12,500 feet of 8" sanitary sewer pipeline using both pipe bursting and trenched techniques. Reconnection of approx 70 user services will be required. Rehabilitation of select manhole structures will be required. Project will require bypass sewage pumping, site stabilization, and all associated work to deliver a complete functional sewer system.
Southern Ute Indian Tribe
Installation of stormwater institutional controls at the forestry fuels wood yard for the environmental programs department. The Tribe will engage the Contractor, as needed, to perform services, including: site engineering improvements (stormwater controls, grading, installation of road base), waste management infrastructure, and herbicide treatment for noxious weeds
Posted Date
May 2, 2025
Due Date
Jun 5, 2025
Release: May 2, 2025
Southern Ute Indian Tribe
Close: Jun 5, 2025
Installation of stormwater institutional controls at the forestry fuels wood yard for the environmental programs department. The Tribe will engage the Contractor, as needed, to perform services, including: site engineering improvements (stormwater controls, grading, installation of road base), waste management infrastructure, and herbicide treatment for noxious weeds
Southern Ute Indian Tribe
DESIGN-BUILD services to demolish the former school approx., 17,000 SF.
Posted Date
Jul 14, 2024
Due Date
Aug 3, 2024
Release: Jul 14, 2024
Southern Ute Indian Tribe
Close: Aug 3, 2024
DESIGN-BUILD services to demolish the former school approx., 17,000 SF.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chief Information Officer, Southern Ute Shared Services
Director of Investments, Permanent Fund Investments (PFI)
Premium
Access the largest public sector contact database
© 2026 Starbridge