Project consists install, integrate, start up, and commission a third hydroelectric generating unit in an existing powerhouse bay. Owner will furnish the turbine, generator, transformer, governor, exciter, controls, and other major equipment. Work is supported by an existing detailed 3D design/model, substantially reducing design and constructability risk.
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Ketchikan
County
The county where this buyer is located.
Ketchikan Gateway
Address
Physical address of this buyer.
1900 First Ave
Phone Number
Contact phone number for this buyer.
(907) 228-2281
Zip Code
Postal code for this buyer's location.
99901
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Southeast Alaska Power Agency
Southeast Alaska Power Agency Regular Board Meeting
Date: May 28, 2026Type: Meeting mention
The board meetings covered operational, financial, and strategic initiatives. Key discussions included updates on the Tyee Third Turbine project, electrical infrastructure upgrades such as the 15kV switchgear replacement, and substation design for Ketchikan. The board authorized several contracts, including transmission line brushing, tower replacements, road embankment reconstruction, solar design, and a land lease agreement with the City and Borough of Wrangell. Financial reports, budget revisions, and a revised employment agreement for the CEO were also approved.
Southeast Alaska Power Agency Special Board Meeting
Date: Apr 28, 2026Type: Meeting mention
The board meeting focused on several key agenda items, including the authorization of a ground lease agreement with the City and Borough of Wrangell to support project site access. The board considered a sole-source contract for a solar energy project design, as well as a change order for the Tyee 3rd Turbine and Generator design project due to increased labor and coordination costs. Additionally, the agenda included an executive session for discussions related to the CEO's contract and the review of upcoming meeting dates.
Southeast Alaska Power Agency Special Meeting
Key Contacts
Public-sector contacts connected to Southeast Alaska Power Agency.
The board conducted an executive session regarding the agency's CEO and strategic initiatives. Following this, the board authorized the reclassification of the Wrangell Solar Feasibility Project as a capital project, approved an application for federal investment tax credits, and authorized the CEO to negotiate land leases and easements for the site. Additionally, the board approved a resolution to submit an appropriations request for the Wrangell Grid Reliability and Stability Project and authorized a sole source contract for a condition assessment and uprate study on Swan Lake Unit #1.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Southeast Alaska Power Agency meetings, strategic plans, and budget discussions before the public bid appears.