Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
South Carolina State Ports Authority
Provide Fuel Services for equipment at the SCPA's Inland Port Greer (IPG).
Posted Date
Apr 7, 2026
Due Date
May 1, 2026
Release: Apr 7, 2026
South Carolina State Ports Authority
Close: May 1, 2026
Provide Fuel Services for equipment at the SCPA's Inland Port Greer (IPG).
AvailableSouth Carolina State Ports Authority
Professional services to conduct a comprehensive Facility Condition Assessment (FCA) at the Wando Welch Terminal (WWT) and analysis of its identified facilities, grounds and miscellaneous structures.
Posted Date
Mar 16, 2026
Due Date
Apr 17, 2026
Release: Mar 16, 2026
South Carolina State Ports Authority
Close: Apr 17, 2026
Professional services to conduct a comprehensive Facility Condition Assessment (FCA) at the Wando Welch Terminal (WWT) and analysis of its identified facilities, grounds and miscellaneous structures.
South Carolina State Ports Authority
Work includes furnish and install conduit duct bank from tob building to lower chassis lot canopy. Saw cut and remove existing concrete between lanes 3 & 4 of the chassis lot canopy and for conduits crossing lanes. Replace concrete (match existing) after conduit, grounding, bollards and equipment foundation installation. Furnish and install all conduits, hand holes, bollards and equipment foundations for abb kiosk installation. Furnish and install all grounding. Furnish and install fdb technology enclosure with all internal components. Furnish and install new circuit breakers into existing canopy power panel; etc, see attached file.
Posted Date
Feb 23, 2026
Due Date
Apr 2, 2026
Release: Feb 23, 2026
South Carolina State Ports Authority
Close: Apr 2, 2026
Work includes furnish and install conduit duct bank from tob building to lower chassis lot canopy. Saw cut and remove existing concrete between lanes 3 & 4 of the chassis lot canopy and for conduits crossing lanes. Replace concrete (match existing) after conduit, grounding, bollards and equipment foundation installation. Furnish and install all conduits, hand holes, bollards and equipment foundations for abb kiosk installation. Furnish and install all grounding. Furnish and install fdb technology enclosure with all internal components. Furnish and install new circuit breakers into existing canopy power panel; etc, see attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track South Carolina State Ports Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database