Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
South Alabama Regional Airport Authority
Work inlcudes rehabilitation of sara rw 11-29 to include joint and crack repair, 2" mill & fill with faa p-401 mix, grooving, temporary and permanent markings, new taxilanes at sara for future development, to include existing concrete and asphalt removal, site grading, base, paving, temporary and permanent erosion control.
Posted Date
May 13, 2026
Due Date
Jun 4, 2026
Release: May 13, 2026
South Alabama Regional Airport Authority
Close: Jun 4, 2026
Work inlcudes rehabilitation of sara rw 11-29 to include joint and crack repair, 2" mill & fill with faa p-401 mix, grooving, temporary and permanent markings, new taxilanes at sara for future development, to include existing concrete and asphalt removal, site grading, base, paving, temporary and permanent erosion control.
AvailableSouth Alabama Regional Airport Authority
50' x 50' Box Hangar. Major items of work include: a 50'x50' Box Hangar, Concrete Taxilane, Sidewalk, and hangar electrical.
Posted Date
Jun 29, 2025
Due Date
Jul 21, 2025
Release: Jun 29, 2025
South Alabama Regional Airport Authority
Close: Jul 21, 2025
50' x 50' Box Hangar. Major items of work include: a 50'x50' Box Hangar, Concrete Taxilane, Sidewalk, and hangar electrical.
South Alabama Regional Airport Authority
Major items of work include: 2" mill with a 2" asphalt surface coarse (P-401) for the entire parallel Taxiway and all connectors of Runway 11/29. Removal of one taxiway connector and associated electrical.
Posted Date
Mar 19, 2025
Due Date
Apr 10, 2025
Release: Mar 19, 2025
South Alabama Regional Airport Authority
Close: Apr 10, 2025
Major items of work include: 2" mill with a 2" asphalt surface coarse (P-401) for the entire parallel Taxiway and all connectors of Runway 11/29. Removal of one taxiway connector and associated electrical.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge