Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sioux Falls Regional Airport Authority
Proposed work includes the following: Runway 15-33 Runway Safety Area (RSA) Grading and Drainage Work. Project work items include earthwork, drainage improvements, airfield signage modifications, topsoiling, seeding, mulching, erosion control and traffic control.
Posted Date
Feb 24, 2026
Due Date
Mar 17, 2026
Release: Feb 24, 2026
Sioux Falls Regional Airport Authority
Close: Mar 17, 2026
Proposed work includes the following: Runway 15-33 Runway Safety Area (RSA) Grading and Drainage Work. Project work items include earthwork, drainage improvements, airfield signage modifications, topsoiling, seeding, mulching, erosion control and traffic control.
Sioux Falls Regional Airport Authority
The Weitz/Journey JV, acting as CMAR for the Sioux Falls Regional Airport Authority, is soliciting bids for Mechanical, Plumbing, and Electrical rough-in work associated with the FSD Concourse Expansion – Phase 1 project. Bids are due March 3, 2026 at 2:00 PM CT and must be submitted electronically via BuildingConnected; a 10% bid bond is required for bids of $100,000 or more. This FAA AIP‑funded project includes federal compliance provisions and specifies Minnehaha County, SD as the covered area.
Posted Date
Feb 13, 2026
Due Date
Mar 3, 2026
Release: Feb 13, 2026
Sioux Falls Regional Airport Authority
Close: Mar 3, 2026
The Weitz/Journey JV, acting as CMAR for the Sioux Falls Regional Airport Authority, is soliciting bids for Mechanical, Plumbing, and Electrical rough-in work associated with the FSD Concourse Expansion – Phase 1 project. Bids are due March 3, 2026 at 2:00 PM CT and must be submitted electronically via BuildingConnected; a 10% bid bond is required for bids of $100,000 or more. This FAA AIP‑funded project includes federal compliance provisions and specifies Minnehaha County, SD as the covered area.
Sioux Falls Regional Airport Authority
The proposed work includes approx. 2,501 SY of scarify and recompact subgrade; 2,501 SY of geotextile fabric for subgrade stabilization; 1,641 TON of aggregate base course, 14"; 575 LF of 1 multimode (MMF) fiber optic cable with short-form factor pluggable connectors and tracer wire, including cable slack; 1,858 LF of 1-1/C no.6 Cu.AWG. THWN-2 600 V, installed in conduit; 710 LF of 1-1/C no.10 Cu.AWG. THWN-2 600 V, installed in conduit; 559 LF of trenching and backfilling or plowing for conduit.
Posted Date
Jan 27, 2026
Due Date
Feb 17, 2026
Release: Jan 27, 2026
Sioux Falls Regional Airport Authority
Close: Feb 17, 2026
The proposed work includes approx. 2,501 SY of scarify and recompact subgrade; 2,501 SY of geotextile fabric for subgrade stabilization; 1,641 TON of aggregate base course, 14"; 575 LF of 1 multimode (MMF) fiber optic cable with short-form factor pluggable connectors and tracer wire, including cable slack; 1,858 LF of 1-1/C no.6 Cu.AWG. THWN-2 600 V, installed in conduit; 710 LF of 1-1/C no.10 Cu.AWG. THWN-2 600 V, installed in conduit; 559 LF of trenching and backfilling or plowing for conduit.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Sioux Falls Regional Airport Authority
The agenda focuses on financial and operational items, including the approval of various change orders for the concourse expansion project, the purchase of a replacement pick-up truck, and authorization to bid for a pavement marking truck. Further business includes a Memorandum of Understanding with Indra Air Traffic, Inc., a lease agreement for an airport hangar, and updates on passenger traffic and construction projects. Key presentations feature the 2025 financial audit, a federal inspection service feasibility study, and schematic designs for the new operations center. The board also addressed the appointment of a board member and conducted the election of officers.
The Board approved various bills and a series of consent agenda items, including multiple construction change orders for the concourse expansion, the purchase of airfield equipment, and several new lease and ground lease agreements. The Executive Director provided a report highlighting record passenger traffic and updates on terminal apron and concourse construction projects. Old business included a discussion on potential development options for a pet-related facility on airport property, which will be further evaluated, and approval of a construction contingency allowance adjustment. New business involved the authorization of a new flight training program, the Pro Flight Academy, and a review of the Authority's Conflict-of-Interest Policy.
The agenda focuses on financial approvals including bills and various change orders for the concourse expansion project. Key operational items include the purchase of replacement airfield fuel pumps and an airfield mower, as well as the approval of multiple lease agreements and amendments, including those for hangar development and property boundary adjustments. Engineering service amendments for the runway project were also included. The executive director report covers passenger traffic data and construction updates, while new business items involve the acquisition of a pavement marking truck and the establishment of a new flight training program.
The board meeting addressed several operational and construction items, including the approval of project bills and a consent agenda concerning construction contingencies and grants for the concourse expansion. The Executive Director provided a report on record-setting passenger traffic growth and provided updates on terminal apron expansion, concourse construction timelines, and the feasibility of a travel stop development. New business items included the approval of a private hangar ground lease, the award of a contract to repair the Runway Safety Area, and the authorization of the final phase for the concourse expansion base build.
The board reviewed and approved financial bills and consent agenda items, including carpet replacement and construction oversight services. The Executive Director provided a report detailing passenger traffic statistics and current concourse construction progress. New business items addressed and approved by the board included the renewal of liability insurance, the award of a construction bid for a new access road, the granting of a temporary construction easement to the city for utility work, and the authorization to move forward with specific alternate bid items for the concourse expansion project utilizing congressionally directed spending funds.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Sioux Falls Regional Airport Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge