Judge-Kentucky Drainage Ditch Project (Request for Proposal)
Posted
Sep 19, 2026
Sep 30, 2026
Provide cleaning, debris removal, inspection, and maintenance of a stormwater outlet and associated drainage area at the project location identified above. The purpose of this project is to restore and maintain proper stormwater flow, remove accumulated debris and sediment, reduce the potential for flooding or erosion, and ensure the stormwater outlet remains functional and unobstructed.

