Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Santa Fe Irrigation District
The work generally consists of the installation of two impressed current cathodic protection surface anode beds with associated excavations and trenching and the connection to the existing rectifiers and associated wiring.
Posted Date
Mar 22, 2026
Due Date
Apr 17, 2026
Release: Mar 22, 2026
Santa Fe Irrigation District
Close: Apr 17, 2026
The work generally consists of the installation of two impressed current cathodic protection surface anode beds with associated excavations and trenching and the connection to the existing rectifiers and associated wiring.
AvailableSanta Fe Irrigation District
Seeking proposals from qualified firms capable of performing construction management and inspection services. The work generally consists of replacing approx 7,300 LF of 4" and 6" asbestos cement (acp) water main with 4", 8", and 10" pvc pipe. Connection of 6", 8", 10" and 24" diameter distribution pipeline.
Posted Date
Mar 15, 2026
Due Date
Apr 9, 2026
Release: Mar 15, 2026
Santa Fe Irrigation District
Close: Apr 9, 2026
Seeking proposals from qualified firms capable of performing construction management and inspection services. The work generally consists of replacing approx 7,300 LF of 4" and 6" asbestos cement (acp) water main with 4", 8", and 10" pvc pipe. Connection of 6", 8", 10" and 24" diameter distribution pipeline.
AvailableSanta Fe Irrigation District
The work generally consists of replacing approx 7,300 FT of 4" and 6" asbestos cement (acp) water main with 4", 8", and 10" pvc pipe. It also includes the removal of two aging pressure reducing stations (prs 360-2 and prs 360-3), which currently reduce pressure from the 520 zone to the 360 zone. The project will also consolidate the 360-pressure zone into the 520 zone, improving operational efficiency and fire flow performance.
Posted Date
Mar 15, 2026
Due Date
Apr 15, 2026
Release: Mar 15, 2026
Santa Fe Irrigation District
Close: Apr 15, 2026
The work generally consists of replacing approx 7,300 FT of 4" and 6" asbestos cement (acp) water main with 4", 8", and 10" pvc pipe. It also includes the removal of two aging pressure reducing stations (prs 360-2 and prs 360-3), which currently reduce pressure from the 520 zone to the 360 zone. The project will also consolidate the 360-pressure zone into the 520 zone, improving operational efficiency and fire flow performance.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Santa Fe Irrigation District
This contract is an Agreement for Professional Services between Santa Fe Irrigation District (buyer) and an unnamed Consultant (seller). It outlines the terms for professional services, including compensation as a time-and-materials contract with a specified maximum amount (currently a placeholder), and procedures for additional work. Key provisions cover time of performance (commencing upon a Notice to Proceed), compliance with various laws including COVID-19 safety measures, insurance requirements, indemnification, California Labor Code compliance, and termination conditions. The exact start and end dates of the services, and the total compensation, are currently placeholders within the document.
Effective Date
-
Expires
Santa Fe Irrigation District
Expires:
This contract is an Agreement for Professional Services between Santa Fe Irrigation District (buyer) and an unnamed Consultant (seller). It outlines the terms for professional services, including compensation as a time-and-materials contract with a specified maximum amount (currently a placeholder), and procedures for additional work. Key provisions cover time of performance (commencing upon a Notice to Proceed), compliance with various laws including COVID-19 safety measures, insurance requirements, indemnification, California Labor Code compliance, and termination conditions. The exact start and end dates of the services, and the total compensation, are currently placeholders within the document.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Santa Fe Irrigation District
The Executive Committee meeting addressed several substantive items across action, discussion, and report categories. Key discussion points included the establishment of a new job description and salary range for an Assistant General Manager/Director of Administrative Services, which was proposed as a reclassification of an existing role to enhance executive leadership capacity and support the General Manager. Other agenda items involved a legislative update tracking bills related to Proposition 218 compliance and wildfire preparedness, and the review of draft agendas for both the Executive Committee and the full Board of Directors meetings scheduled for March 19, 2026. The Committee also reviewed future agenda topics, and received a verbal General Manager's Report, which included updates on ribbon-cutting ceremonies for solar and dam repair projects. A portion of the meeting was dedicated to a Closed Session to discuss labor negotiations with unrepresented employees.
The Board of Directors reviewed and discussed various financial and administrative matters, including the capital acquisition budget adjustment for the dewatering facility centrifuge repair, the establishment of the Assistant General Manager/Director of Administrative Services job description and salary range, and the review of the 2026 Capital Improvement Program update and the five-year outlook. The meeting also addressed legislative and water supply updates, received operational reports, and conducted closed sessions regarding litigation and public employment/labor negotiations.
This document, the 2026 Capital Improvement Program Master Plan Update Memorandum, outlines the strategic direction for addressing distribution and joint facilities needs over a 10-year period (FY27-FY36). It updates the previous 2021 Master Plan by incorporating revised cost estimates due to increased construction expenses, addressing equipment acquisition challenges, and reprioritizing projects based on reduced local water supply availability. The plan defines specific capital investments to enhance infrastructure reliability, ensure cost-effective operations, and achieve sustainable financial management, covering both 'District Only' and Joint Facilities projects.
The meeting included reviewing action and discussion items such as the Minutes from the previous Administrative and Finance Committee Meeting (February 10, 2026), Directors' and General Manager's Expenses, and the Monthly Investment Transaction Report for February 2026. Key discussion points centered on the Review and Discussion of the Santa Fe Irrigation District Five-Year Outlook, which detailed financial projections, major drivers like O&M expenditures, capital spending assumptions, the status of the Lake Hodges Dam replacement project, and various financial scenarios. Reports covered Administrative Services, Public Communications and Outreach, and the General Manager's activities.
The meeting agenda includes discussions on a Capital Acquisition budget adjustment for dewatering facility repairs, the establishment of an Assistant General Manager/Director of Administrative Services role, updates on the 2026 Capital Improvement Program, and a review of the District's Five-Year Outlook. Legislative and water supply updates are scheduled. The Board will also conduct closed sessions regarding existing and anticipated litigation and property negotiations.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Santa Fe Irrigation District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database