EGJG Water Treatment Plant Driveway Expansion at Newhall Ranch Road Project
Posted
Sep 2, 2026
Oct 13, 2026
Work includes approx 82 LF of V-Ditch Drainage Gutter; 17 LF of 12" HDPE Corrugated Storm Drain Pipe and Connections; 4,736 SF of 8" Concrete Pavement, Macro-Fiber Reinforcement, & Thick; 81 LF of 1/2" Expansion Joint; 146 SF of 4" Concrete Sidewalk.
