Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sandwich Water District
Laboratory analysis of water samples.
Posted Date
May 31, 2026
Due Date
Jun 18, 2026
Release: May 31, 2026
Sandwich Water District
Close: Jun 18, 2026
Laboratory analysis of water samples.
AvailableSandwich Water District
Sale of one (1) 2005 chevrolet silverado 2500 hd pickup, single cab, 8' bed, 2wd one (1) 2006 chevrolet silverado 2500 hd pickup, single cab, 8' bed, 2wd one (1) international harvester 8 cyl. Propane auxillary engine model #c 605 ge 12.
Posted Date
Jul 19, 2024
Due Date
Aug 7, 2024
Release: Jul 19, 2024
Sandwich Water District
Close: Aug 7, 2024
Sale of one (1) 2005 chevrolet silverado 2500 hd pickup, single cab, 8' bed, 2wd one (1) 2006 chevrolet silverado 2500 hd pickup, single cab, 8' bed, 2wd one (1) international harvester 8 cyl. Propane auxillary engine model #c 605 ge 12.
Sandwich Water District
The Work includes the relocation of instrumentation and electrical equipment, modifications to the Project Site electrical service, providing tank mixing system, providing a complete cathodic protection system, construction of overflow rip rap containment area, providing overflow piping from Tank 3 to rip rap containment area, replacement of asphalt access driveway including grade modifications and Tank 3 perimeter asphalt, providing precast concrete vault including control valves and about 100 LFt of yard piping including legal disposal of asbestos cement piping.
Posted Date
Feb 7, 2025
Due Date
Feb 27, 2025
Release: Feb 7, 2025
Sandwich Water District
Close: Feb 27, 2025
The Work includes the relocation of instrumentation and electrical equipment, modifications to the Project Site electrical service, providing tank mixing system, providing a complete cathodic protection system, construction of overflow rip rap containment area, providing overflow piping from Tank 3 to rip rap containment area, replacement of asphalt access driveway including grade modifications and Tank 3 perimeter asphalt, providing precast concrete vault including control valves and about 100 LFt of yard piping including legal disposal of asbestos cement piping.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge