Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Russellville Water and Sewer
Bid for the removal and replacement of flat-top roofs at 3 County Complex Circle and 5 County Complex Circle, utilizing a Siplast Paradiene 20 TG/30 FR TG roofing system with Siplast Veral Aluminum flashing.
Posted Date
May 18, 2026
Due Date
Jun 10, 2026
Release: May 18, 2026
Russellville Water and Sewer
Close: Jun 10, 2026
Bid for the removal and replacement of flat-top roofs at 3 County Complex Circle and 5 County Complex Circle, utilizing a Siplast Paradiene 20 TG/30 FR TG roofing system with Siplast Veral Aluminum flashing.
AvailableRussellville Water and Sewer
Project will consist of but not be limited to the removal and disposal of the existing gravel top roof, removal and disposal of existing flashing and surfacing, installation of siplast paradiene 20 tg/30 fr tg roofing system with siplast veral aluminum flashing.
Posted Date
May 31, 2026
Due Date
Jun 10, 2026
Release: May 31, 2026
Russellville Water and Sewer
Close: Jun 10, 2026
Project will consist of but not be limited to the removal and disposal of the existing gravel top roof, removal and disposal of existing flashing and surfacing, installation of siplast paradiene 20 tg/30 fr tg roofing system with siplast veral aluminum flashing.
AvailableRussellville Water and Sewer
Project includes modification of the pcw's influent pump station and piping to improve hydraulic influent capacity including piping, valves, flow meter, pipe supports, demolition, electrical and controls improvements, and all appurtenances.
Posted Date
Aug 24, 2025
Due Date
Sep 11, 2025
Release: Aug 24, 2025
Russellville Water and Sewer
Close: Sep 11, 2025
Project includes modification of the pcw's influent pump station and piping to improve hydraulic influent capacity including piping, valves, flow meter, pipe supports, demolition, electrical and controls improvements, and all appurtenances.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge