Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Roscoe Turner Airport
Project consists of a pre-engineered 80'x 100' metal hangar with apron pavement, electrical hookup and lighting, sewer system, and water service line.
Posted Date
Feb 24, 2026
Due Date
Mar 25, 2026
Release: Feb 24, 2026
Roscoe Turner Airport
Close: Mar 25, 2026
Project consists of a pre-engineered 80'x 100' metal hangar with apron pavement, electrical hookup and lighting, sewer system, and water service line.
AvailableRoscoe Turner Airport
Project consist of approx 2,154 LF of 9.75'x 6.58' cmp pipe spraycast; 2 EA of 9.75'x 6.58 cast in place concrete arch pipe wingwall; 850 SY of geotextile loose riprap; 1,160 LF of silt fence. 15 LF removal of existing 9.75' x 6.58' cmp; 2,154 LF spraycast for 9.75' x 6.58' cmp pipe; 1,000 CF injection grouting; 1 CF injection grouting unit price beyond 1,000 CF; 1 EA dual 9.75' x 6.58' cast-in-place concrete arch pipe wingwall/headwall section (upstream); 750 TN loose riprap, size 300; 850 SY geotextile under loose riprap, type V; 2 EA temporary construction entrance; 1 LS sediment removal (pipes); 1,160 LF temporary silt fence; 1 LS temporary diversion using sandbags; 1 LS temporary sediment filter bag; 1 LS rutting repair, grade restroration and grassing. See attached file.
Posted Date
Jun 16, 2025
Due Date
Jul 29, 2025
Release: Jun 16, 2025
Roscoe Turner Airport
Close: Jul 29, 2025
Project consist of approx 2,154 LF of 9.75'x 6.58' cmp pipe spraycast; 2 EA of 9.75'x 6.58 cast in place concrete arch pipe wingwall; 850 SY of geotextile loose riprap; 1,160 LF of silt fence. 15 LF removal of existing 9.75' x 6.58' cmp; 2,154 LF spraycast for 9.75' x 6.58' cmp pipe; 1,000 CF injection grouting; 1 CF injection grouting unit price beyond 1,000 CF; 1 EA dual 9.75' x 6.58' cast-in-place concrete arch pipe wingwall/headwall section (upstream); 750 TN loose riprap, size 300; 850 SY geotextile under loose riprap, type V; 2 EA temporary construction entrance; 1 LS sediment removal (pipes); 1,160 LF temporary silt fence; 1 LS temporary diversion using sandbags; 1 LS temporary sediment filter bag; 1 LS rutting repair, grade restroration and grassing. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Roscoe Turner Airport's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database