Construction of an Addition & Renovations To the Philip W. Sugg Middle School RFP
Posted
Oct 7, 2026
Nov 19, 2026
Work includes but is not limited to, selective demolition, earthwork, site utilities and site improvements, paving and landscaping. Work also includes asbestos abatement, concrete foundations and slab-on-grade, steel structure, steel joists and decking, roof membrane over roof insulation, masonry, metal stud partitions, metal siding, insulation, gypsum board walls and ceilings, acoustical ceilings, resilient flooring, ceramic tiling, carpeting, custom cabinets and fixtures, carpentry, metal doors, wood doors, metal frames, door hardware, painting, toilet accessories, foodservice equipment, gymnasium equipment, signage, fire protection and detection systems, security systems, electrical, and heating, ventilating, and air conditioning complete and ready for use.