Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Rahway Valley Sewerage Authority
Lateral CIPP. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: Mobilization, Field engineering and surveying, Locating existing utilities, Preparation of submittals, Site preparatory activities including acquisition of necessary permits or notifications, Installation of temporary facilities required to stage the work, Implementation of traffic control, if necessary, CCTV inspection, Temporary bypass pumping (if required), Sewer Cleaning, Cured in Place Pipe Lining, Miscellaneous work, restoration, and cleanup, Demobilization, Project closeout, All other Work necessary to complete the work and as indicated in the Contract Documents.
Posted Date
Jun 23, 2026
Due Date
Aug 11, 2026
Release: Jun 23, 2026
Rahway Valley Sewerage Authority
Close: Aug 11, 2026
Lateral CIPP. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: Mobilization, Field engineering and surveying, Locating existing utilities, Preparation of submittals, Site preparatory activities including acquisition of necessary permits or notifications, Installation of temporary facilities required to stage the work, Implementation of traffic control, if necessary, CCTV inspection, Temporary bypass pumping (if required), Sewer Cleaning, Cured in Place Pipe Lining, Miscellaneous work, restoration, and cleanup, Demobilization, Project closeout, All other Work necessary to complete the work and as indicated in the Contract Documents.
AvailableRahway Valley Sewerage Authority
Interceptor sewer cleaning and inspection services.
Posted Date
Aug 12, 2025
Due Date
Aug 28, 2025
Release: Aug 12, 2025
Rahway Valley Sewerage Authority
Close: Aug 28, 2025
Interceptor sewer cleaning and inspection services.
Rahway Valley Sewerage Authority
Furnish & deliver sodium hypochlorite.
Posted Date
Jul 30, 2025
Due Date
Aug 14, 2025
Release: Jul 30, 2025
Rahway Valley Sewerage Authority
Close: Aug 14, 2025
Furnish & deliver sodium hypochlorite.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Rahway Valley Sewerage Authority
The meeting included reports on plant and collection system operations, including the status of the Renewable Natural Gas Project and the upcoming public hearing regarding the Environmental Justice process. The Board discussed ongoing engineering matters, including bar screen replacement and digester operations, as well as legal updates concerning proposed settlements with the 3M Company and DuPont regarding PFAS liability. Resolutions were approved to close out the headworks influent bar screen replacement contract, authorize a property damage release, and formally withdraw the Authority's opposition to the proposed Judicial Consent Orders related to PFAS settlements. Additionally, the Board reviewed and approved financial bills and claims for various funds.
The meeting included reports from the Executive Director regarding plant operations and maintenance, ongoing collection system updates, and proposed engineering projects funded by PSE&G. The Board also reviewed updates on the electric vehicle charging station installation. Reports were presented by the consulting engineer concerning retainer and miscellaneous engineering services, and by general counsel regarding PFAS litigation and proposed settlements with 3M and DuPont. The Finance Committee reviewed bills and claims, which were subsequently approved for payment. An executive session was held to discuss attorney-client privileged matters related to pending litigation.
The meeting included the election of a new Chairman and Vice Chairman, swearing in of commissioners, and a review of executive and engineering reports regarding plant operations, sewer endorsements, and ongoing engineering projects. The Board established the meeting schedule for the upcoming year, designated check signatories, and authorized the defense and indemnification of members and employees. Discussions also covered legal matters including proposed PFAS settlement agreements and shared services agreements, along with the review and payment of bills and claims from operating and equipment funds. The meeting concluded after an executive session held to discuss personnel and legal matters.
The meeting included reports from the Treasurer, Executive Director, Consulting Engineer, and General Counsel regarding ongoing facility operations, engineering matters, and legal status updates, including PFAS-related settlements. New business included the approval of an amendment to Contract #2425 with Aquafix, Inc. for chemical treatments and an amendment to the access agreement with Pride Solvents & Chemical Company of NJ for the installation of additional monitoring wells. The board also reviewed and approved bills and claims for payment and held a closed session to discuss matters related to attorney-client privilege.
The meeting included reports from the Executive Director, Consulting Engineer, and General Counsel. Key operational updates included the status of the Headworks HVAC project, PST #2 repair completion, and ongoing work on Digester #3. The Authority successfully conducted a PJM Emergency Load Response test. An issue with the cogen system booster required specialized repair, and staff addressed a small fire in the discharge conveyor related to the dryer. The Executive Director was authorized to endorse Sewer Connection and TWA Applications, and Resolution #26-02 authorizing endorsement for a 39-unit apartment building construction was voided. Financial matters included the approval of Bills & Claims totaling $1,681,414.98 across operating and building/equipment funds. The Authority adjourned to a closed session to discuss attorney-client privilege matters concerning the 3M PFAS settlement.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Rahway Valley Sewerage Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge