Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Potomac Highlands Airport Authority
Work includes construction of pre-engineered metal building t-hangers with reinforced concrete footings and poured concrete floor slab. Metal panel walls and roof, with metal gutters and downspouts. Downspouts tied to subsurface drainage. Each t-hanger to have vertical opening bi fold hanger door with personnel door. Side spaces to include electrical service room with distribution panel and storage room. Electrical work includes providing a new electrical service, distribution panel, LED lighting, convenience outlets and power to door motors and controls. Site work includes installation of inlets, HDPE storm pipe and concrete aprons to connect into the existing taxiway pavement.
Posted Date
Jun 6, 2026
Due Date
Jun 26, 2026
Release: Jun 6, 2026
Potomac Highlands Airport Authority
Close: Jun 26, 2026
Work includes construction of pre-engineered metal building t-hangers with reinforced concrete footings and poured concrete floor slab. Metal panel walls and roof, with metal gutters and downspouts. Downspouts tied to subsurface drainage. Each t-hanger to have vertical opening bi fold hanger door with personnel door. Side spaces to include electrical service room with distribution panel and storage room. Electrical work includes providing a new electrical service, distribution panel, LED lighting, convenience outlets and power to door motors and controls. Site work includes installation of inlets, HDPE storm pipe and concrete aprons to connect into the existing taxiway pavement.
AvailablePotomac Highlands Airport Authority
Work includes construction of pre-engineered metal building t-hangers with reinforced concrete footings and poured concrete floor slab. Metal panel walls and roof, with metal gutters and downspouts. Downspouts tied to subsurface drainage. Each t-hanger to have vertical opening bi fold hanger door with personnel door. Side spaces to include electrical service room with distribution panel and storage room. Electrical work includes providing a new electrical service, distribution panel, LED lighting, convenience outlets and power to door motors and controls. Site work includes installation of inlets, HDPE storm pipe and concrete aprons to connect into the existing taxiway pavement.
Posted Date
Jun 6, 2026
Due Date
Jun 26, 2026
Release: Jun 6, 2026
Potomac Highlands Airport Authority
Close: Jun 26, 2026
Work includes construction of pre-engineered metal building t-hangers with reinforced concrete footings and poured concrete floor slab. Metal panel walls and roof, with metal gutters and downspouts. Downspouts tied to subsurface drainage. Each t-hanger to have vertical opening bi fold hanger door with personnel door. Side spaces to include electrical service room with distribution panel and storage room. Electrical work includes providing a new electrical service, distribution panel, LED lighting, convenience outlets and power to door motors and controls. Site work includes installation of inlets, HDPE storm pipe and concrete aprons to connect into the existing taxiway pavement.
AvailablePotomac Highlands Airport Authority
Work includes contractor quality control program 1 ls; temporary pipe slope drain 460 lf; compost filter sock 12" (install and remove) 4600 lf; stone construction entrance; erosion control matting (ditches) 2315 lf; rock lined ditch 550 lf; sediment basin 1 ea; mobilization 1 ls; pavement removal 12, 583 sy; clearing and grubbing 2 ac; muck excavation 1000 cy; embankment in place 104,500 cy; markings (temporary runway 5-23) 1 ls: reflective media 1 ls; raise storm manhole structure 1 ea; seeding 55 ac; mulching 55 ac; led medium intensity runway edge light, l-861 (l), stake mounted 54 ea; removed runway fixture, base mounted, complete 72 ea; locate and protect existing equipment 1 ls; shot rock 16084 cy; wire forms 13,997 lf; maintaining traffic 1 ls. See attached file.
Posted Date
May 21, 2025
Due Date
Jun 12, 2025
Release: May 21, 2025
Potomac Highlands Airport Authority
Close: Jun 12, 2025
Work includes contractor quality control program 1 ls; temporary pipe slope drain 460 lf; compost filter sock 12" (install and remove) 4600 lf; stone construction entrance; erosion control matting (ditches) 2315 lf; rock lined ditch 550 lf; sediment basin 1 ea; mobilization 1 ls; pavement removal 12, 583 sy; clearing and grubbing 2 ac; muck excavation 1000 cy; embankment in place 104,500 cy; markings (temporary runway 5-23) 1 ls: reflective media 1 ls; raise storm manhole structure 1 ea; seeding 55 ac; mulching 55 ac; led medium intensity runway edge light, l-861 (l), stake mounted 54 ea; removed runway fixture, base mounted, complete 72 ea; locate and protect existing equipment 1 ls; shot rock 16084 cy; wire forms 13,997 lf; maintaining traffic 1 ls. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge