Summary
Work includes construction of pre-engineered metal building t-hangers with reinforced concrete footings and poured concrete floor slab. Metal panel walls and roof, with metal gutters and downspouts. Downspouts tied to subsurface drainage. Each t-hanger to have vertical opening bi fold hanger door with personnel door. Side spaces to include electrical service room with distribution panel and storage room. Electrical work includes providing a new electrical service, distribution panel, LED lighting, convenience outlets and power to door motors and controls. Site work includes installation of inlets, HDPE storm pipe and concrete aprons to connect into the existing taxiway pavement.